The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan work
|
|
Potential workplace hazards are identified Completed |
Evidence:
|
Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment Completed |
Evidence:
|
Weight (mass) of load is estimated in consultation with associated personnel Completed |
Evidence:
|
Appropriate paths for moving load/s in work area are determined Completed |
Evidence:
|
Crane is appropriate to the load/s Completed |
Evidence:
|
Appropriate communication methods are identified in consultation with associated personnel Completed |
Evidence:
|
Conduct routine checks
|
|
Appropriate hazard prevention/control measures are applied to work area in accordance with procedures Completed |
Evidence:
|
Crane is accessed in a safe manner Completed |
Evidence:
|
Crane is visually checked for any damage or defects Completed |
Evidence:
|
All signage and labels are checked to ensure they are visible and legible, in accordance with the appropriate standard Completed |
Evidence:
|
Routine pre-operational crane checks are carried out in accordance with procedures Completed |
Evidence:
|
All controls are located and identified Completed |
Evidence:
|
Crane service logbook is checked for compliance Completed |
Evidence:
|
Crane is started in accordance with procedures and is checked for any abnormal noises Completed |
Evidence:
|
Crane safety devices are tested in accordance with procedures Completed |
Evidence:
|
Post-start operational checks are carried out in accordance with procedures Completed |
Evidence:
|
Communications equipment is checked for serviceability Completed |
Evidence:
|
All damage and defects are reported and recorded in accordance with procedures, and appropriate action is taken Completed |
Evidence:
|
Transfer loads
|
|
Hoist block is positioned over load following directions from associated personnel, as required Completed |
Evidence:
|
Test lift is carried out in accordance with procedures to allow for checks to be safely made, in consultation with relevant personnel Completed |
Evidence:
|
Loads are transferred using all relevant crane movements in accordance with procedures and appropriate standard Completed |
Evidence:
|
All required communications signals are interpreted correctly in accordance with procedures and appropriate standard Completed |
Evidence:
|
Crane is operated in accordance with procedures Completed |
Evidence:
|
Load movements are monitored constantly, to ensure safety of personnel and load, and structural stability Completed |
Evidence:
|
Unplanned and/or unsafe situations are responded to in accordance with procedures Completed |
Evidence:
|
Shut down and secure crane
|
|
Crane is parked in accordance with procedures Completed |
Evidence:
|
Crane and equipment are stowed and secured in accordance with procedures and appropriate standard Completed |
Evidence:
|
Relevant motion locks and brakes are applied as required Completed |
Evidence:
|
Crane is shut down in accordance with procedures Completed |
Evidence:
|
Routine post-operational crane checks are carried out in accordance with procedures Completed |
Evidence:
|
Hazard prevention/control measures are removed as required Completed |
Evidence:
|
All damage and defects are reported and recorded in accordance with procedures, and appropriate action is taken Completed |
Evidence:
|