The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan work
|
|
Potential workplace hazards are identified Completed |
Evidence:
|
Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment Completed |
Evidence:
|
The weight of the load is identified and estimated in consultation with associated personnel Completed |
Evidence:
|
Crane is appropriate to the load/s and workplace conditions Completed |
Evidence:
|
Appropriate paths for the movement of loads in the work area is inspected and determined Completed |
Evidence:
|
Appropriate communicationmethods are identified with associated personnel Completed |
Evidence:
|
Conduct routine checks
|
|
Crane is visually checked for any damage or defects Completed |
Evidence:
|
Crane is accessed in a safe manner Completed |
Evidence:
|
All signage and labels are visible and legible according to the appropriate standard Completed |
Evidence:
|
Routine pre-operational crane checks are carried out according to procedures Completed |
Evidence:
|
All controls are located and identified Completed |
Evidence:
|
Crane service logbook is checked for compliance Completed |
Evidence:
|
Crane is started according to procedures and checked for any abnormal noises Completed |
Evidence:
|
All crane safety devices are tested according to procedures Completed |
Evidence:
|
Post-start operational checks are carried out according to procedures Completed |
Evidence:
|
All communication equipment is checked for serviceability Completed |
Evidence:
|
All damage and defects are reported and recorded according to procedures, and appropriate action is taken Completed |
Evidence:
|
Set up crane
|
|
Ground suitability is checked Completed |
Evidence:
|
Crane is driven to the work area according to procedures Completed |
Evidence:
|
Crane is positioned for work application and stability according to procedures Completed |
Evidence:
|
Appropriate crane configuration for work task is determined according to procedures (where applicable) Completed |
Evidence:
|
Boom/jib and counterweight configuration data is input into the crane computer (as required) Completed |
Evidence:
|
Appropriate hazard prevention/control measures are applied to the work area according to procedures Completed |
Evidence:
|
All communications equipment is tested for functionality Completed |
Evidence:
|
Transfer load
|
|
Lifts are determined within the capacity of the crane Completed |
Evidence:
|
Boom/jib and hoist block is positioned over load following directions from associated personnel Completed |
Evidence:
|
Test lift is carried out according to procedures Completed |
Evidence:
|
Loads are transferred using all relevant crane movements according to procedures and the appropriate standard Completed |
Evidence:
|
All required communication signals are correctly interpreted according to procedures and the appropriate standard Completed |
Evidence:
|
Crane is operated according to procedures Completed |
Evidence:
|
Load movement is monitored constantly ensuring safety to personnel and load, and crane stability Completed |
Evidence:
|
Unplanned and/or unsafe situations are responded to in line with procedures Completed |
Evidence:
|
Mobile load
|
|
Suitability of planned route is checked for the crane according to procedures Completed |
Evidence:
|
Crane is configured to mobile load according to procedures Completed |
Evidence:
|
Load is moved using best mobile practice according to the appropriate standard Completed |
Evidence:
|
Shut down and secure crane
|
|
Crane boom/jib and equipment are stowed and secured where appropriate according to procedures and the appropriate standard Completed |
Evidence:
|
Relevant motion locks and brakes are applied (where applicable) Completed |
Evidence:
|
Outriggers/stabilisers are stowed and secured according to procedures Completed |
Evidence:
|
Crane is shut down according to procedures Completed |
Evidence:
|
Plates or packing are stowed and secured Completed |
Evidence:
|
Routine post-operational crane checks are carried out according to procedures Completed |
Evidence:
|
All damage and defects are reported and recorded according to procedures, and appropriate action is taken Completed |
Evidence:
|