The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Identify job requirements
|
|
Scope of work is determined and resources are arranged Completed |
Evidence:
|
Replacement rail is checked for compliance with acceptance standards in accordance with workplace procedures Completed |
Evidence:
|
Prepare rail for installation
|
|
Rails are loaded and unloaded using approved methods to minimise risk to health and safety Completed |
Evidence:
|
Rails are cut to required length using an appropriate method to minimise delays and wastage Completed |
Evidence:
|
If required, rails are bent to the correct curvature to ensure correct track geometry is maintained to standard Completed |
Evidence:
|
Install rail
|
|
Where required, existing rail is unfastened and removed using appropriate equipment or manual method Completed |
Evidence:
|
New rail is lifted into place using appropriate equipment or manual method maximising efficiency and minimising risk of injuries Completed |
Evidence:
|
Join rail ends
|
|
Rail joints are prepared for welding or are assembled and installed to specifications in accordance with workplace procedures Completed |
Evidence:
|
Rail bonds or other track circuit connections are installed/restored as required in accordance with workplace procedures Completed |
Evidence:
|
Restore track
|
|
Track fastenings are restored in accordance with workplace procedures Completed |
Evidence:
|
Arrangements are made for rail to be adjusted in accordance with workplace procedures Completed |
Evidence:
|
Complete documentation
|
|
Completed work is checked for compliance to standards to ensure safe operations of trains Completed |
Evidence:
|
Required documentation is completed in accordance with workplace procedures Completed |
Evidence:
|