The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Construct points and crossings
|
|
Work requirements are determined to identify scope of work and resources required Completed |
Evidence:
|
Delivered materials are checked for compliance with design Completed |
Evidence:
|
Assembly area is prepared Completed |
Evidence:
|
Structure is fabricated according to design specification if required to minimise on-site disruptions to on-site workflow, if applicable Completed |
Evidence:
|
Track layout is assembled in accordance with the specified design, manufacturers instructions and workplace procedures Completed |
Evidence:
|
Track layout dimensions, geometry and condition are checked for compliance with design Completed |
Evidence:
|
Track layout is prepared for transport to site in accordance with manufacturers instructions and workplace procedures Completed |
Evidence:
|
Track layout is transported to installation site using appropriate methods and equipment in accordance with workplace requirements and procedures Completed |
Evidence:
|
Install points and crossing
|
|
Existing trackwork is removed from worksite Completed |
Evidence:
|
Track bed is prepared for installation of track layout in accordance with workplace procedures Completed |
Evidence:
|
New points and crossings are installed in accordance with specified design, manufacturers instructions and workplace procedures Completed |
Evidence:
|
Track layout dimensions, geometry, condition and operation are checked for compliance to standards in accordance with design, manufacturers instructions and workplace procedures Completed |
Evidence:
|
Complete documentation
|
|
Required documentation is completed in accordance with workplace procedures Completed |
Evidence:
|