The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to lay wiring/cabling and connect accessories for extra-low voltage circuits.
|
|
OHS procedures for a given work area are obtained and understood through established routines. Completed |
Evidence:
|
Established OHS risk control measures in preparation for the work are followed. Completed |
Evidence:
|
Safety hazards not previously identified are reported and advice on risk control measures is sought from the work supervisor. Completed |
Evidence:
|
The nature and location of the work is obtained from work supervisor or other appropriate person to establish the scope of work to be undertaken. Completed |
Evidence:
|
Advice is sought from the work supervisor or other appropriate person to ensure the work is coordinated effectively with others. Completed |
Evidence:
|
Sources of materials that may be required for the work are established in accordance with established routines. Completed |
Evidence:
|
Tools, equipment and testing devices needed to carry out the work are obtained and checked for correct operation and safety. Completed |
Evidence:
|
Lay wiring/cabling and connect accessories for extra-low voltage circuits.
|
|
Established OHS risk control measures for carrying out the work are followed. Completed |
Evidence:
|
Circuits/machines/plant are checked as being isolated where necessary in strict accordance OHS requirements and procedures. Completed |
Evidence:
|
Wiring and accessories are installed to comply standards and job specifications with sufficient excess to affect terminations. Completed |
Evidence:
|
Accessories are installed straight and square in the required locations and within acceptable tolerances. Completed |
Evidence:
|
Cables and conductors are terminated at accessories in accordance with manufacture’s specifications and regulatory requirements. Completed |
Evidence:
|
Cables installed for future service and marked in accordance with the cable identification scheme and terminated incompliance with regulatory requirements. Completed |
Evidence:
|
Procedures for referring non-routine events to immediate supervisor for directions are followed. Completed |
Evidence:
|
Cable installation and termination is carried out efficiently without waste of materials or damage to apparatus, circuits or the surrounding environment and using sustainable energy practices. Completed |
Evidence:
|
Complete and report work activities.
|
|
OHS work completion risk control measures and procedures are followed. Completed |
Evidence:
|
Work site is cleaned and made safe in accordance with established procedures. Completed |
Evidence:
|
Work supervisor is notified of the completion of the installation work in accordance with established routines. Completed |
Evidence:
|