The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to install wiring and accessories.
|
|
OHS procedures for a given work area are identified, obtained and understood. Completed |
Evidence:
|
Health and safety risks are identified and established risk control measures and procedures in preparation for the work are followed. Completed |
Evidence:
|
Safety hazards that have not previously been identified are noted and established risk control measures are implemented. Completed |
Evidence:
|
Installation of wiring is prepared in consultation with other affected by the work and sequenced appropriately. Completed |
Evidence:
|
The nature and location of the work is determined from documentation or other appropriate person to establish the scope of work to be undertaken. Completed |
Evidence:
|
Cable routes are planned within the constraints of the building structure, significants and requirements. Completed |
Evidence:
|
Material needed for the installation work is obtained in accordance with established procedures and checked against job requirements. Completed |
Evidence:
|
Tools, equipment and testing devices needed to for the installation work are obtained in accordance with established procedures and checked for correct operation and safety. Completed |
Evidence:
|
Preparatory work is checked to ensure no damage has occurred and complies with requirements. Completed |
Evidence:
|
Install wiring and accessories.
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures. Completed |
Evidence:
|
Circuits/machines/plant are checked as being isolated where necessary in strict accordance OHS requirements and procedures. Completed |
Evidence:
|
Wiring and accessories are installed to comply with technical standards and job specifications and requirements with sufficient excess to affect terminations. Completed |
Evidence:
|
Accessories are installed straight and square in the required locations and within acceptable tolerances. Completed |
Evidence:
|
Cables and conductors are terminated at accessories in accordance with manufacture's specifications and regulatory requirements. Completed |
Evidence:
|
Ongoing compliance and safety inspection of installed wiring systems and testing of installed circuits is undertaken. Completed |
Evidence:
|
Defects revealed through on-going compliance and safety inspection and tests are rectified. Completed |
Evidence:
|
Cable installation and termination is carried out efficiently without unnecessary waste of materials or damage to apparatus, circuits or the surrounding environment and using sustainable energy practices. Completed |
Evidence:
|
Unexpected situations are dealt with safely and with the approval of an authorised person. Completed |
Evidence:
|
Completion and report installation activities.
|
|
OHS work completion risk control measures and procedures are followed. Completed |
Evidence:
|
Work site is cleaned and made safe in accordance with established procedures. Completed |
Evidence:
|
'As-installed' cables/wiring and accessories is documented and an appropriate person or persons notified in accordance with established procedures. Completed |
Evidence:
|