The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to tune control loop with advance functions
|
|
OHS procedures for a given work area are identified, obtained and understood Completed |
Evidence:
|
Established OHS risk control measures and procedures are followed in preparation for the work. Completed |
Evidence:
|
Safety hazards that have not previously been identified are noted, and established risk control measures are implemented. Completed |
Evidence:
|
Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site Completed |
Evidence:
|
Advanced control loop parameters are identified by reviewing process specification and equipment manuals. Completed |
Evidence:
|
Tools, equipment and testing devices needed for the work are obtained in accordance with established procedures and checked for correct operation and safety Completed |
Evidence:
|
Preparatory work is checked to ensure no damage has occurred and that work complies with requirements Completed |
Evidence:
|
The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures Completed |
Evidence:
|
Circuits/machines/plant are checked as being isolated where necessary in strict accordance OHS requirements and procedures Completed |
Evidence:
|
Tune control loop for advanced functions
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Testing/measuring devices are connected and set up in accordance with requirements for a particular control system for advanced functions. Completed |
Evidence:
|
Control set-point is established and control loop adjusted in accordance with process specification Completed |
Evidence:
|
Process is observed and decisions made in consultation with process operation personnel to readjusted control loop settings to ensure process demand and output quality is met. Completed |
Evidence:
|
Process control loops are readjusted as required and checked. Completed |
Evidence:
|
Established methods for dealing with unexpected situations are discussed with appropriate person or persons and documented. Completed |
Evidence:
|
Unexpected situations are dealt with safely and with the approval of an authorised person. Completed |
Evidence:
|
Ongoing checks of the quality of process output are undertaken to ensure control loop is tuned as required. Completed |
Evidence:
|
Tuning is carried out efficiently without waste of materials or damage to apparatus, the surrounding environment or services and using sustainable energy principles. Completed |
Evidence:
|
Completion and report control loop tuning activities
|
|
OHS risk control work completion measures and procedures are followed. Completed |
Evidence:
|
Work site is cleaned and made safe in accordance with established procedures. Completed |
Evidence:
|
Control loop settings are documented and appropriate person(s) notified in accordance with established procedures Completed |
Evidence:
|