The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to develop an integrated system
|
|
The types and location of loads and control devices is determined from project specifications and customer requirements. Completed |
Evidence:
|
The number of control bus networks and current requirements are determined from load calculations for devices on the system. Completed |
Evidence:
|
Appropriate placement of system devices in the system scheme is determined from bus network power and load parameters and to maintain system stability. Completed |
Evidence:
|
The integrated system is developed to comply with regulator, safety and manufacturer’s requirements. Completed |
Evidence:
|
A take-off of the number of devices and accessories required for the system is documented using manufacturer’s title and ID for each. Completed |
Evidence:
|
Programming and diagnostic tools needed for the project are down loaded to a compatible PC and checked for correct operation and safety. Completed |
Evidence:
|
Program integrated system devices
|
|
OHS risk control work measures and procedures are followed. Completed |
Evidence:
|
Modes of programming are applied to developing the integrated system in accordance with manufacturers and programming software instructions. Completed |
Evidence:
|
Manufacturer’s instructions and recommendations are followed in programming system devices to project requirements. Completed |
Evidence:
|
Parameters for operation of loads are programmed to project requirements and within manufacturer’s designated range. Completed |
Evidence:
|
The programmed system data base is saved and backed up in accordance with manufacturer’s instructions. Completed |
Evidence:
|
Load and test integrated system
|
|
OHS risk control work measures and procedures are followed. Completed |
Evidence:
|
Data base of integrated system program is transferred to the network. Completed |
Evidence:
|
All functions of the integrated system are tested for compliance with project requirements and manufacturer’s specifications. Completed |
Evidence:
|
Diagnostic tools are used to locate any system faults, defects or anomalies. Completed |
Evidence:
|
Defects or anomalies are corrected to comply with project requirements and manufacturer’s specifications. Completed |
Evidence:
|
A copy of the documentation of integrated system is given the client or client’s representative. Completed |
Evidence:
|