The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to fabricate tubing and attach fittings for refrigeration and/or air conditioning systems
|
|
OHS procedures for a given work area are identified, obtained and understood through established routines and procedures Completed |
Evidence:
|
Established OHS risk control measures and procedures are followed in preparation for the work. Completed |
Evidence:
|
Safety hazards which have not previously been identified are reported and advice on risk control measures is sought from the work supervisor. Completed |
Evidence:
|
The nature of work is obtained from documentation or from work supervisor to establish the scope of work to be undertaken. Completed |
Evidence:
|
Advice is sought from the work supervisor to ensure the work is coordinated effectively with others. Completed |
Evidence:
|
Sources of materials that may be required for the work are accessed in accordance with established routines and procedures. Completed |
Evidence:
|
Tools, equipment and testing devices needed to carry out the work are obtained and checked for correct operation and safety Completed |
Evidence:
|
Fabricate tubing and attach fittings for refrigeration and/or air conditioning systems
|
|
Established OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Work in strict accordance with OHS requirements and when necessary conducted within established safety procedures Completed |
Evidence:
|
Established methods used to cut, flare, swage, bend, silver braze tubing and fittings as they apply to the refrigeration/air conditioning equipment arrangements. Completed |
Evidence:
|
Refrigerant tubing and fittings are silver brazed with the use of dry nitrogen to prevent contamination. Completed |
Evidence:
|
Fabricate tubing and attach fittings are prepared efficiently without waste of materials or damage/contamination to apparatus and the surrounding environment or services and using sustainable energy practices. Completed |
Evidence:
|
Routine quality checks are carried out in accordance with work instructions/or specifications including dimensions and pressure testing. Completed |
Evidence:
|
Complete work and report
|
|
OHS work completion risk control measures and procedures are followed. Completed |
Evidence:
|
Work site is cleaned and made safe in accordance with established procedures. Completed |
Evidence:
|
Work supervisor is notified of the completion of the work in accordance with established procedures. Completed |
Evidence:
|