The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to install and maintain track circuit leads and bonds
|
|
OHS procedures for a given work area are identified, obtained and understood. Completed |
Evidence:
|
Established OHS risk control measures and procedures are followed in preparation for the work. Completed |
Evidence:
|
Safety hazards that have not previously been identified are noted, and established risk control measures are implemented. Completed |
Evidence:
|
Installation and maintenance of track circuit leads and bonds is appropriately sequenced in accordance with job schedule. Completed |
Evidence:
|
Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site. Completed |
Evidence:
|
Installation and maintenance instructions are reviewed to obtain clear and concise work requirements. Completed |
Evidence:
|
Site bonding layout plan is reviewed to clarify bonding requirements. Completed |
Evidence:
|
Material needed to install and maintain track circuit leads and bonds is obtained in accordance with established procedures and checked against job requirements Completed |
Evidence:
|
Tools, equipment and testing devices needed to install and maintain track circuit leads and bonds are obtained in accordance with established procedures and checked for correct operation and safety Completed |
Evidence:
|
Preparatory work is checked to ensure no unnecessary damage has occurred and complies with requirements Completed |
Evidence:
|
Install track circuit leads and bonds
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Specified leads of bonds are run and positioned appropriately to the formation conditions and to minimise potential damage from track maintenance machines. Completed |
Evidence:
|
Positions of boxes and cable pits are checked to ensure compliance with specifications and appropriate follow up action is initiated where necessary. Completed |
Evidence:
|
Components and rail services a prepared to ensure secure and sound connections can be made. Completed |
Evidence:
|
Leads or bonds are connected using appropriate fastening techniques and ensuring technical appliance is achieved. Completed |
Evidence:
|
Established methods for dealing with unexpected situations are discussed with appropriate person(s) and documented. Completed |
Evidence:
|
Unexpected situations are dealt with safely and with the approval of an authorised person. Completed |
Evidence:
|
Track circuit leads and bonds are installed and connected efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices. Completed |
Evidence:
|
Maintain track circuit leads and bonds
|
|
OHS risk control work completion measures and procedures are followed. Completed |
Evidence:
|
Bonds, leads and rail connections are checked for damage or determination and appropriate corrective action is initiated. Completed |
Evidence:
|
Appropriate tests are completed to identify components requiring repair or replacement. Completed |
Evidence:
|
Repair or replacement of components is carried out with due regard to train movements and safety of personnel involved. Completed |
Evidence:
|
Temporary bonding is installed where required and electrical readings on bonds/lead connections and insulated rail joints are taken to ensure compliance with specifications and site bonding layout plan. Completed |
Evidence:
|
Track related equipment is inspected for faults or damage and all faults are documented and appropriate follow up action is initiated. Completed |
Evidence:
|