The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to install and test computer based interlocking equipment
|
|
OHS procedures for a given work area are identified, obtained and understood. Completed |
Evidence:
|
Established OHS risk control measures and procedures are followed in preparation for the work. Completed |
Evidence:
|
Safety hazards that have not previously been identified are documented and risk control measures devised and implemented in consultation with appropriate personnel. Completed |
Evidence:
|
The extent of the installation is determined from job specifications, drawings and regulatory requirements Completed |
Evidence:
|
Tools, equipment and testing devices needed to install the computer based interlocking equipment are obtained in accordance with established procedures and checked for correct operation and safety. Completed |
Evidence:
|
Preparatory work is checked to ensure no unnecessary damage has occurred and complies with requirements. Completed |
Evidence:
|
Install interlocking computers and computer data and communication link equipment.
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Cubicles, computer housings and associated equipment are installed in accordance with specifications and work orders. Completed |
Evidence:
|
Computer data link equipment is installed in accordance with specifications and work orders Completed |
Evidence:
|
Modems and associated equipment is installed in accordance with specifications and work orders. Completed |
Evidence:
|
Cables are installed and connections/terminations made, including plug couplers, in accordance with specifications and work orders. Completed |
Evidence:
|
Installation is carried out efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices. Completed |
Evidence:
|
Install trackside interfaces
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Trackside function modules and interface equipment is installed in accordance with specifications and work orders. Completed |
Evidence:
|
Cables are installed and connections/terminations made in accordance with specifications and work orders. Completed |
Evidence:
|
Power supply is checked, adjusted and confirmed as being within specifications. Completed |
Evidence:
|
Load required for testing is connected and confirmed in accordance with specifications Completed |
Evidence:
|
Interface equipment is powered up in the correct sequence using correct fuse type and rating in preparation for testing. Completed |
Evidence:
|
Installation is carried out efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices. Completed |
Evidence:
|
Conduct pre-commissioning power-up checks
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
All cards are checked for correct position and seating and all vital I/O connections isolated. Completed |
Evidence:
|
Correct firmware module installation is confirmed in accordance with specifications Completed |
Evidence:
|
Voltage level and polarities are confirmed through energising power supplies 'off load'. Completed |
Evidence:
|
Computer based interlocking equipment is energised and all message indications are checked as in compliance with specifications. Completed |
Evidence:
|
'On load' voltage levels are checked for compliance with specification. Completed |
Evidence:
|
Test computer based interlocking equipment operations
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Message generator is connected in accordance with testing procedures. Completed |
Evidence:
|
Test sequences are run in accordance with testing procedures to confirm that equipment is installed correctly and to test all equipment functions. Completed |
Evidence:
|
Test results are monitored, measured and recorded to confirm all operations are with specification. Completed |
Evidence:
|
Document installation and testing completion work
|
|
OHS work completion risk control measures and procedures are followed. Completed |
Evidence:
|
Work site is made safe in accordance with established safety procedures. Completed |
Evidence:
|
Any non-compliance operation or equipment are identified and corrective action recorded. Completed |
Evidence:
|
Corrective action is implemented to rectify installation defects or replace faulty equipment. Completed |
Evidence:
|
Operational integrity of the system is confirmed and recorded in accordance with TFM analysis sheets and checklists. Completed |
Evidence:
|
All work completion is documented and appropriate person(s) notified in accordance with established procedures. Completed |
Evidence:
|