The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to install and maintain train detection equipment
|
|
OHS procedures for a given work area are identified, obtained and understood. Completed |
Evidence:
|
Established OHS risk control measures and procedures are followed in preparation for the work. Completed |
Evidence:
|
The extent of the installation and/or maintenance is determined from maintenance schedules, job specifications, drawings and regulatory requirements Completed |
Evidence:
|
Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site Completed |
Evidence:
|
Materials needed for the installation and/or maintenance work are obtained in accordance with established procedures and checked against job requirements Completed |
Evidence:
|
Tools, equipment and testing devices needed for the installation and/or maintenance work are obtained in accordance with established procedures and checked for correct operation and safety. Completed |
Evidence:
|
Install and maintain train detection equipment
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Installation and maintenance work is carried out to manufacturer specifications using procedures consistent with delegated authority. Completed |
Evidence:
|
Normal function and operating parameters are confirmed using appropriate manuals, specifications and commissioning data. Completed |
Evidence:
|
Fault finding and diagnostic techniques are completed to verify system/faults. Completed |
Evidence:
|
Faulty, damaged or insecure components are replaced, repaired or secured in accordance with manufacturer specifications and organisation procedures. Completed |
Evidence:
|
Installation and maintenance, adjusting and testing work is carried out efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices. Completed |
Evidence:
|
Appropriate readings are measured and recorded using relevant test instruments. Completed |
Evidence:
|
Equipment is tested and adjusted in accordance with the specifications. Completed |
Evidence:
|
Equipment operational tests are completed to specifications and procedures. Completed |
Evidence:
|
Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes. Completed |
Evidence:
|
Complete the installation and maintenance of train detection equipment
|
|
OHS risk control work completion measures and procedures are followed. Completed |
Evidence:
|
Correct calibration of equipment is verified and equipment is confirmed as fulfilling functional tests in accordance with organisation certification procedures. Completed |
Evidence:
|
Work completion is documented and appropriate persons notified in accordance with established procedures, and relevant reports produced Completed |
Evidence:
|