The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to install pipe work, flow controls and accessories
|
|
WHS/OHS hazards, risk control methods, relevant standards, codes and legislation are obtained and applied Completed |
Evidence:
|
Safety hazards which have not previously been identified are noted, assessed and risk control measures implemented in accordance with workplace procedures |
|
Completed |
Evidence:
|
Pipe work, flow control and accessory installation are sequenced in accordance with workplace procedures and job schedule |
|
Completed |
Evidence:
|
Work details are determined from documentation and/or supervisor to establish scope of work to be completed |
|
Completed |
Evidence:
|
Pipe work routes are planned within the constraints of the building structure, including heritage specifications, in accordance with workplace procedures |
|
Completed |
Evidence:
|
Supervisor is consulted, as required, to ensure work is coordinated with others |
|
Completed |
Evidence:
|
Materials to install pipe work, flow controls and accessories are obtained and checked against job requirements in accordance with workplace procedures |
|
Completed |
Evidence:
|
Tools, equipment and testing devices to install pipe work, flow controls and accessories are obtained and checked for operational safety |
|
Completed |
Evidence:
|
Install pipe work, flow controls and accessories
|
|
Circuits, machines and plant are checked as being isolated, where necessary, in accordance with workplace procedures and WHS/OHS requirements Completed |
Evidence:
|
Pipe work, flow controls and accessories are installed with sufficient access for connections and maintenance in accordance with workplace procedures, industry standards and job specification |
|
Completed |
Evidence:
|
Pipe work, flow controls and accessories are installed straight and square, in required locations and within acceptable tolerances in accordance with workplace procedures |
|
Completed |
Evidence:
|
Dry nitrogen is used to prevent contamination while silver brazing refrigerant tubing and fittings in accordance with workplace procedures |
|
Completed |
Evidence:
|
Problematic situations from installation of pipe work, flow controls and accessories are resolved in accordance with workplace procedures |
|
Completed |
Evidence:
|
Checks on quality of pipe work, flow controls and accessories are undertaken, including pressure testing and repair of leaks, in accordance with workplace procedures and relevant industry standards |
|
Completed |
Evidence:
|
Adjustment of settings and replacement of flow controls are undertaken, as required, in accordance with workplace procedures |
|
Completed |
Evidence:
|
Pipe work, flow controls and accessories are installed without waste of materials, damage or contamination to apparatus, the surrounding environment and/or services using relevant sustainable energy practices in accordance with workplace procedures |
|
Completed |
Evidence:
|
Complete pipe work, flow controls and accessories installation
|
|
Worksite is cleaned and made safe in accordance with workplace procedures Completed |
Evidence:
|
Final check of installed pipe work is made to verify that it complies with workplace and industry requirements |
|
Completed |
Evidence:
|
'As-installed' pipe work, flow controls and accessories are documented and supervisor notified in accordance with workplace procedures |
|
Completed |
Evidence:
|