The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to install/ non-vital telemetry system
|
|
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified Completed |
Evidence:
|
Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures implemented in preparation for work |
|
Completed |
Evidence:
|
Safety hazards not previously identified are noted on job safety assessments, and risk control measures are determined and implemented |
|
Completed |
Evidence:
|
Function of equipment is determined in accordance with operating manuals, rail system specifications and rail transport operator's interface |
|
Completed |
Evidence:
|
Materials needed to install/maintain non-vital telemetry system are obtained in accordance with system specifications and workplace procedures |
|
Completed |
Evidence:
|
Tools, equipment and testing devices needed to install/maintain non-vital telemetry system and diagnose the fault are obtained in accordance with workplace procedures and checked for correct operation and safety |
|
Completed |
Evidence:
|
Install/maintain non-vital telemetry system
|
|
WHS/OHS risk control measures and workplace procedures for carrying out the work are followed Completed |
Evidence:
|
Installation/maintenance work is carried out in accordance with manufacturer specifications and workplace procedures |
|
Completed |
Evidence:
|
Normal function and operating parameters are confirmed in accordance with appropriate manuals, job/manufacturer specifications and rail operator's interface |
|
Completed |
Evidence:
|
Fault-finding and diagnostic techniques are undertaken using circuit diagrams and manufacturer specifications to verify system/faults |
|
Completed |
Evidence:
|
Methods for dealing with unplanned situations are determined on the basis of safety and specified work outcomes |
|
Completed |
Evidence:
|
Installation/maintenance work is carried out efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices |
|
Completed |
Evidence:
|
Fault/s is isolated and assessed to determine appropriate repair method, tools, test and measurement instruments to be used |
|
Completed |
Evidence:
|
Faulty, damaged or insecure components are replaced/repaired or secured in accordance with manufacturer/technical specifications, workplace procedures and returned to service |
|
Completed |
Evidence:
|
Parts/components identified as suitable for replacement are replaced from available parts/component resources |
|
Completed |
Evidence:
|
Parts/components requiring repairs beyond the repair capacity of the service centre are despatched for external repairs or disposed of in accordance with workplace procedures |
|
Completed |
Evidence:
|
Faults are diagnosed and rectified efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices |
|
Completed |
Evidence:
|
Repaired/replaced equipment is tested using approved test equipment in accordance with appropriate test procedures to ensure equipment is fully operational |
|
Completed |
Evidence:
|
Test equipment is checked to ensure it is calibrated to manufacturer/technical specifications in accordance with industry standards and workplace procedures |
|
Completed |
Evidence:
|
Appropriate adjustments and calibrations are carried out to manufacturer/technical specifications in accordance with industry standards and workplace procedures |
|
Completed |
Evidence:
|
Complete non-vital telemetry system installation/maintenance
|
|
WHS/OHS work completion risk control measures and workplace procedures are followed Completed |
Evidence:
|
Documentation is completed to confirm equipment has been repaired to manufacturer specifications and relevant technical reports produced |
|
Completed |
Evidence:
|
Arrangements are made for the safe return of equipment to the customer and in accordance with workplace procedures |
|
Completed |
Evidence:
|