The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to repair rail signalling cables
|
|
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for work area are identified, obtained and applied Completed |
Evidence:
|
Hazards are identified, risks assessed, and control measures and workplace procedures implemented |
|
Completed |
Evidence:
|
Safety hazards that have not previously been identified are noted on the job safety assessments and existing risk control measures implemented |
|
Completed |
Evidence:
|
Access times and safe work methods are confirmed to comply with customer requirements and relevant rail safety legislation |
|
Completed |
Evidence:
|
Appropriate person/s is consulted to ensure work is coordinated effectively with others on the worksite |
|
Completed |
Evidence:
|
Extent and nature of the fault or damage to the rail signalling cable is confirmed with appropriate person/s in accordance with workplace procedures |
|
Completed |
Evidence:
|
Cable joining kit is obtained in accordance with workplace procedures and components checked with manufacturer specifications |
|
Completed |
Evidence:
|
Cable diagrams necessary to effect repairs are obtained, read and interpreted |
|
Completed |
Evidence:
|
Tools and cable testing devices for cable repair are obtained in accordance with workplace procedures and checked for correct operation and safety |
|
Completed |
Evidence:
|
Repair damaged rail signalling cables
|
|
Work area is made safe, damaged rail signalling cable is isolated for repair and WHS/OHS risk control measures and workplace procedures for carrying out the repair/s are followed Completed |
Evidence:
|
On-track safe working requirements are identified and applied in accordance with workplace procedures and safety management system |
|
Completed |
Evidence:
|
Corresponding ends of broken cable core are identified by core marking and confirmed by continuity test in accordance with workplace procedures |
|
Completed |
Evidence:
|
Cable joining kit is used to repair damaged cable following manufacturer specifications and workplace procedures |
|
Completed |
Evidence:
|
Repair to damaged cable is tested for cable core continuity insulation between cable cores and cores to earth in accordance with workplace procedures |
|
Completed |
Evidence:
|
Cause of failed cable test is located and rectified in accordance with workplace procedures |
|
Completed |
Evidence:
|
Existing work methods for dealing with unplanned situations are dealt with safely in a manner that minimises risk to personnel and equipment and with the approval of an authorised person/s |
|
Completed |
Evidence:
|
Cable repair is completed without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices |
|
Completed |
Evidence:
|
Complete rail signalling cable repairs
|
|
WHS/OHS work completion risk control measures and workplace procedures are followed Completed |
Evidence:
|
Work area is cleaned and made safe in accordance with workplace procedures |
|
Completed |
Evidence:
|
On-track safe working requirements are removed in accordance with workplace procedures and safety management system |
|
Completed |
Evidence:
|
Cable repair work, test results and relevant reports are documented and appropriate person/s notified in accordance with workplace procedures |
|
Completed |
Evidence:
|