Evidence Guide: UEGNSG344A - Commission or decommission gas transmission pipelines

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEGNSG344A - Commission or decommission gas transmission pipelines

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare and plan to commission/decommission gas transmission pipelines

  1. Work schedule(s), including drawings, plans, requirements, established procedures and material lists are received, analysed and confirmed if necessary by site inspection
  2. WHS/OHS and environmental measures for the sites are identified, obtained and understood.
  3. Relevant requirements and established procedures for the work are communicated to all persons and identified for all work sites
  4. WHS/OHS, environmental and sustainable energy policies and procedures are obtained and confirmed and communicated
  5. Work is prioritised and sequenced by management following consultation with others for completion within acceptable timeframes and in accordance with established procedures
  6. Hazards are identified, WHS/OHS risks are assessed and control measures are prioritised, implemented and monitored against the work schedule and established procedures.
  7. Relevant work permits are obtained to access, isolate/de-energise systems and perform work according to requirements and established procedures
  8. Scope of responsibility under the relevant work permit/authorization is received and confirmed with relevant persons according to requirements and established procedures
  9. Resources including persons, equipment, tools, materials, plans, specifications and personal protective equipment required to carry out the work are identified, scheduled and obtained and checked for operation and safety
  10. Relevant persons at worksite are confirmed to be current in First Aid and other related work procedures according to requirements
  11. Liaison and communication issues with authorised persons, authorities, clients and land owners are resolved and activities coordinated to carry out work by management
  12. Pipeline in check for readiness (cleaned, pigged, bypassed, etc.) for commissioning/ decommissioning
  13. Site is prepared according to the work schedule and to minimise risk and damage to property, commerce and individuals in accordance with established procedures
  14. Persons participating in the work, including plant operators and contractors are fully briefed and respective responsibilities confirmed in accordance with established procedures
  15. Road signs, barriers and warning devices are positioned in accordance with requirements including traffic management plans
Work schedule(s), including drawings, plans, requirements, established procedures and material lists are received, analysed and confirmed if necessary by site inspection

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS and environmental measures for the sites are identified, obtained and understood.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant requirements and established procedures for the work are communicated to all persons and identified for all work sites

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS, environmental and sustainable energy policies and procedures are obtained and confirmed and communicated

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is prioritised and sequenced by management following consultation with others for completion within acceptable timeframes and in accordance with established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, WHS/OHS risks are assessed and control measures are prioritised, implemented and monitored against the work schedule and established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permits are obtained to access, isolate/de-energise systems and perform work according to requirements and established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope of responsibility under the relevant work permit/authorization is received and confirmed with relevant persons according to requirements and established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resources including persons, equipment, tools, materials, plans, specifications and personal protective equipment required to carry out the work are identified, scheduled and obtained and checked for operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant persons at worksite are confirmed to be current in First Aid and other related work procedures according to requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Liaison and communication issues with authorised persons, authorities, clients and land owners are resolved and activities coordinated to carry out work by management

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pipeline in check for readiness (cleaned, pigged, bypassed, etc.) for commissioning/ decommissioning

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site is prepared according to the work schedule and to minimise risk and damage to property, commerce and individuals in accordance with established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Persons participating in the work, including plant operators and contractors are fully briefed and respective responsibilities confirmed in accordance with established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Road signs, barriers and warning devices are positioned in accordance with requirements including traffic management plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commission/decommission gas transmission pipelines

  1. WHS risk control measures, schedule of work and standard operating procedures for carrying out the work are followed
  2. Appropriate materials, tools, equipment and measuring devices are selected and used correctly and safely.
  3. Hazardous activities such as lifting, climbing, working in confined spaces, excavations, trenches, or aloft, and use of power tools, techniques and practices are conducted safely accordance with given instructions and requirements
  4. Commissioning/ decommissioning of gas transmission pipelines is carried out efficiently in an agreed timeframe and to required standards with a minimum of waste of materials or damage to apparatus, circuits, the surrounding environment or services and using sustainable energy principles
  5. Commissioning/decommissioning of gas transmission pipelines is carried out in accordance with the work schedule and to requirements/established procedures
  6. Hazard warnings and safety signs are recognised and hazards are assessed and WHS/OHS risks and incidents are reported to the immediate authorised persons for directions according to established procedures
  7. Adjustments are made for unplanned events in commissioning/decommissioning of gas transmission pipelines are undertaken within the scope of established procedures
  8. Procedures for referring non-routine events to the immediate authorised persons for directions are followed
  9. Reports and ongoing checks of quality of the work are undertaken in accordance with given instructions and established procedures
WHS risk control measures, schedule of work and standard operating procedures for carrying out the work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate materials, tools, equipment and measuring devices are selected and used correctly and safely.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazardous activities such as lifting, climbing, working in confined spaces, excavations, trenches, or aloft, and use of power tools, techniques and practices are conducted safely accordance with given instructions and requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commissioning/ decommissioning of gas transmission pipelines is carried out efficiently in an agreed timeframe and to required standards with a minimum of waste of materials or damage to apparatus, circuits, the surrounding environment or services and using sustainable energy principles

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commissioning/decommissioning of gas transmission pipelines is carried out in accordance with the work schedule and to requirements/established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazard warnings and safety signs are recognised and hazards are assessed and WHS/OHS risks and incidents are reported to the immediate authorised persons for directions according to established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjustments are made for unplanned events in commissioning/decommissioning of gas transmission pipelines are undertaken within the scope of established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Procedures for referring non-routine events to the immediate authorised persons for directions are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Reports and ongoing checks of quality of the work are undertaken in accordance with given instructions and established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work and relevant documentation

  1. WHS/OHS risk control work completion measures and procedures are followed
WHS/OHS risk control work completion measures and procedures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment appropriate to the testing requirements are selected and work undertaken is checked against works schedule for conformance with requirements, anomalies are reported in accordance with established procedures

  1. Accidents and injuries are reported in accordance with requirements and established procedures where applicable
  2. Work site is rehabilitated, cleaned up and made safe in accordance with given instructions and established procedures
  3. Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and stored securely in accordance with established procedures
  4. Relevant work permit(s) are signed off and equipment is returned to service in accordance with requirements
  5. Final inspections are undertaken and work completion documentation is finalised and processed accurately and provided to appropriate persons in accordance with established procedures.
Accidents and injuries are reported in accordance with requirements and established procedures where applicable

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is rehabilitated, cleaned up and made safe in accordance with given instructions and established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and stored securely in accordance with established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permit(s) are signed off and equipment is returned to service in accordance with requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final inspections are undertaken and work completion documentation is finalised and processed accurately and provided to appropriate persons in accordance with established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

8) The Evidence Guide forms an integral part of this Unit and shall be used in conjunction with all components parts of the unit and performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment

8.1)

Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry’s preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry regulatory policy in this regard.

Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.

The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be ‘rich’ in nature so as to minimise error in judgment.

Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practiced. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit

8.2)

Before the critical aspects of evidence are considered all prerequisites shall be met.

Evidence for competence in this unit shall be considered holistically. Each element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the ‘Assessment Guidelines — UEG11’. Evidence shall also comprise:

A representative body of work performance demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and range

Apply sustainable energy principles and practices as specified in the Performance Criteria and range

Demonstrate an understanding of the required knowledge and skills as described in this unit to such an extent that the learner’s performance outcome is reported in accordance with the preferred approach; namely a percentile graded result, where required by the regulated environment

Demonstrate an appropriate level of employability skills

Conduct work observing the relevant anti-discrimination legislation, regulations, polices and workplace procedures

Demonstrate performance across a representative range of contexts from the prescribed items below.

Commission and de-commission gas transmission pipelines as described in 9.) Range Statement and including:

Range of tools/equipment/procedures/workplace

Group No

The minimum number of items on which skill is to be demonstrated

Item List

A

All

Relevant knowledge of AS 1697

Relevant knowledge of AS 2885

Relevant knowledge of AS 2865

Interpret technical drawings and symbols.

Documentation complete/correct

Approvals from authorities complete/correct.

Emergency Response procedures

Environmental Code of Practice applied.

Communicate with other authorities and Stakeholders.

B

At Least 2

Steel pipeline coating repair

Steel pipeline coating testing

Steel field joint coating

C

All

Purging Procedures

Compliance with AS 2885

Operation of Gas Detector

Isolate, vent and purge gas pipeline systems

Communication with authorities

Environmental issues.

D

At Least 2

City Gate operation (Pressure Regulator knowledge)

Line Valve operation

Pressure control procedure

E

All

Basic understanding only:

Trenching

Shoring

F

All

Basic understanding only:

Pipeline Cathodic Protection.

Relevant electrical safety.

G

All

Pressure is according to specifications

Final Inspections are carried out

Site rehabilitation carried out

Sign Off Procedures carried out

H

At least one occasion

Deal with an unplanned event by drawing on essential knowledge and associated skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items

Context of and specific resources for assessment

8.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:

OHS policy and work procedures and instructions.

Suitable work environment, facilities, equipment and materials to undertake actual work as prescribed by this Competency Standard Unit.

Appropriate environmental regulation and work practices.

Appropriate organisational requirements.

Appropriate work environment, equipment and tools.

These should be part of the formal learning/assessment environment

Assessment of this competency must also be undertaken in either an actual workplace or under a simulated work environment. Assessment must also integrate the employability skills.

Method of assessment

8.4)

This Competency Standard Unit shall be assessed by methods given in Volume 1, Part 3 ‘Assessment Guidelines’.

Note: Competent performance with inherent safe working practices is expected in the Industry to which this Competency Standard Unit applies. This requires that the specified Required Knowledge and Skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the required knowledge and associated skills described in this unit.

Concurrent assessment and relationship with other units

8.5)

There are no recommended concurrent assessments with this unit, however in some cases efficiencies may be gained in terms of learning and assessment effort being concurrently managed with allied Competency Standard Units where listed.

UEGNSG132A

Carry out basic work activities in a gas industry work environment

UEGNSG141A

Apply Workplace Health and Safety regulations codes and practices in the gas industry

UEGNSG140A

Apply environmental policies and procedures in the utilities industry

UEGNSG134A

Establish a utilities infrastructure work site

BSBFLM312B

Contribute to team effectiveness

BSBFLM303C

Contribute to effective workplace relationships

Required Skills and Knowledge

7) This describes the skills and knowledge and their level, required for this unit.

Evidence shall show that knowledge has been acquired of safe working practices for the commissioning/decommissioning of gas transmission pipelines.

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies. The extent of the Required Skills and Knowledge required is provided below. It forms an integral part of this unit.

KS01-G344A Transmission pipeline commissioning and decommissioning

Evidence shall show an understanding of commissioning and de-commissioning gas transmission pipelines in accordance with relevant legislation, standards, codes and established procedures to an extent indicated by the following aspects:

T1. Legislative, standards, codes and OHS and environmental requirements

requirements for and use of qualified specialists

establishing the appropriate worksite

T2. Site preparation

identify equipment, pipes, fittings, purge substances

pipeline and component specifications

apply purge volume and time tables and charts

T3. Environmental and safety hazards

risks and control measures

site emergency procedures

T4. Fundamentals of pipeline commissioning/decommissioning

Purpose

Bring pipeline systems online, taking systems offline

Purging the pipe system

Ensuring security of supply

Testing and sealing of pipes

Fit bypass apparatus

Regulating and monitoring system pressure

Hazards and risks

T5. Tools and test equipment for commissioning and decommissioning

Types, applications, use, handling, maintenance and storage

T6. Testing, adjusting, calibrating and repairing systems

requirements procedures, precautions

T7. Enterprise procedures for de-commissioning

bringing/taking pipeline system on/off line

effect on distribution system

fitting bypass apparatus ensuring continuity of supply

stopping off and isolation of pipelines using internal and external stop off equipment

monitoring of system pressure at appropriate locations depending on network design and operating conditions

regulating and maintaining system pressures

test and verify

T8. Enterprise procedures for commissioning

checking pipework is ready (tested, pigged, etc.)

purging the pipe system using a variety of media and testing procedures

testing and sealing of pipelines,

odour level requirements

effect on distribution system

monitoring of system pressure at appropriate locations depending on network design and operating conditions

regulating and maintaining system pressures

equipment faults

test and verify

T9. Stakeholder and record management

Communications and approvals

Recording and reporting

Range Statement

9)This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.

This Competency Standard Unit shall be demonstrated in relation to commissioning/ decommissioning gas transmission pipelines.

The following constants and variables included in the element/Performance Criteria in this unit are fully described in the Definitions Section of this volume and form an integral part of the Range Statement of this unit:

Appropriate Persons

Tools, Materials and Equipment

Appropriate Authorities

Pipeline Systems

Documentation

Tools, materials and equipment