NTISthis.com

Evidence Guide: UEPMNT367 - Install and commission stationary gas fuelled reciprocating engines

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEPMNT367 - Install and commission stationary gas fuelled reciprocating engines

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install and commission stationary gas fuelled reciprocating engine

  1. Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations are obtained and implemented, in accordance with workplace procedures
Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations are obtained and implemented, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Health and safety risks are identified and risk control measures are followed, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety hazards that have not previously been identified are noted and risk control measures are implemented, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design specification for gas fuelled reciprocating engines to be installed and commissioned are accessed, analysed and confirmed through a detailed site inspection

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design specification matters requiring clarification are resolved through liaison with designer and gas authorities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Formal authority to proceed with installation and commissioning of stationary gas fuelled reciprocating engine is obtained before commencing work, in accordance with workplace procedures, regulatory and code of practice requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation is prepared and is sequenced, in accordance with workplace procedures and quality assurance requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Nature and location of the installation and commissioning of the stationary gas fuelled reciprocating engine is determined from documentation or appropriate personnel to establish scope of work and assigned roles to be undertaken

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stationary gas fuelled reciprocating engine plant, equipment component specifications and manufacturers' manuals are obtained

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plant, equipment, fuel train pipe work and components are identified and locations are sequenced within the constraints of site and work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials needed for installation are obtained, in accordance with workplace procedures and design specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment including personal protective equipment and testing devices are obtained, in accordance with workplace procedures and are checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is prepared to support installation and commissioning of gas fuelled reciprocating engine plant and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install stationary gas fuelled reciprocating engine

  1. Regulatory and code of practice recording and reporting requirements are satisfied throughout work sequence, in accordance with workplace procedures
Regulatory and code of practice recording and reporting requirements are satisfied throughout work sequence, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gas and electrical circuits, machines and plant are checked as being isolated, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stationary gas fuelled reciprocating engine components including fuel train, associated pipe work and flue/exhaust systems are installed, in accordance with workplace procedures, design specifications, technical standards and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ventilation systems are installed, in accordance with workplace procedures and design specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Electrical components, wiring enclosures and terminations are installed, in accordance with workplace procedures, design and manufacturers' specifications and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ongoing compliance and safety inspections of installed gas fuelled reciprocating engine, equipment, pipe work, components and accessories is undertaken and identified defects are rectified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stationary gas fuelled reciprocating engine installation is carried out without waste of materials or damage to plant, equipment, pipe work, components, accessories, the surrounding environment or services using workplace identified sustainable energy principles and practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unexpected situations are dealt with safely, in accordance with workplace procedures and the approval of authorised personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commission stationary gas fuelled reciprocating engine

  1. Gas and electrical safety checks and isolation procedures, including purging are completed and recorded to manufacturers' and regulatory requirements before testing and commissioning are commenced
Gas and electrical safety checks and isolation procedures, including purging are completed and recorded to manufacturers' and regulatory requirements before testing and commissioning are commenced

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operational parameters of individual components are tested and adjusted to conform to manufacturers' specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Reciprocating engine operations are tested, first without, and then with fuel, and adjustments are completed, as required, with results recorded in accordance with workplace procedures and approving authority requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Exhaust gases are analysed, in accordance with workplace procedures, industry practice and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commissioning of stationary gas fuelled reciprocating engine is conducted without waste of materials or damage to apparatus and the surrounding environment or services using workplace sustainable energy procedures and practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Completion and report installation and commissioning activities

  1. Final check of installed gas fuelled reciprocating engine is made to verify compliance with regulatory and certification requirements
Final check of installed gas fuelled reciprocating engine is made to verify compliance with regulatory and certification requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleared and materials are disposed of or are recycled, in accordance with legislation and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are cleaned, checked, serviced and stored, in accordance with manufacturers' recommendations and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is cleaned and made safe, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installed reciprocating engine equipment components, pipe work, flue, exhaust systems and accessories are documented and appropriate personnel are notified, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.