NTISthis.com

Evidence Guide: UEPMNT441 - Test and commission power plant inverter systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEPMNT441 - Test and commission power plant inverter systems

What evidence can you provide to prove your understanding of each of the following citeria?

Test equipment

  1. Isolations are confirmed, where appropriate, in accordance with workplace procedures
  2. Equipment is tested using appropriate plans, drawings and manuals, in accordance with workplace procedures
  3. Test conditions are confirmed and equipment is inspected to ensure absence of any damage, defect or deterioration, in accordance with workplace procedures
  4. Equipment is tested using approved testing techniques, in accordance with workplace procedures
  5. Equipment test results are interpreted and documented, in accordance with workplace procedures
Isolations are confirmed, where appropriate, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is tested using appropriate plans, drawings and manuals, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test conditions are confirmed and equipment is inspected to ensure absence of any damage, defect or deterioration, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is tested using approved testing techniques, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment test results are interpreted and documented, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commission equipment

  1. Isolations are confirmed, where appropriate, in accordance with workplace procedures site requirements
  2. Inverter system equipment is commissioned using plans, drawings and manuals, in accordance with workplace procedures
  3. Inverter system equipment is set up, in accordance with workplace procedures, operational requirements and manufacturers' specifications
  4. Testing results are interpreted and documented to ensure equipment operates within manufacturers' specifications
  5. Inverter system equipment is commissioned, in accordance with workplace procedures
  6. Final inspection is carried out, in accordance with workplace procedures
Isolations are confirmed, where appropriate, in accordance with workplace procedures site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inverter system equipment is commissioned using plans, drawings and manuals, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inverter system equipment is set up, in accordance with workplace procedures, operational requirements and manufacturers' specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Testing results are interpreted and documented to ensure equipment operates within manufacturers' specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inverter system equipment is commissioned, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final inspection is carried out, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work

  1. Work is completed and appropriate personnel are notified, in accordance with workplace procedures
  2. Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures
  3. Tools and equipment are maintained and stored, in accordance with workplace procedures
  4. Work completion details are finalised, in accordance with workplace procedures
Work is completed and appropriate personnel are notified, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are maintained and stored, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work completion details are finalised, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare for work

  1. Requirements including scope of work and assigned roles are identified and confirmed with appropriate personnel or by site inspection, in accordance with workplace procedures
Requirements including scope of work and assigned roles are identified and confirmed with appropriate personnel or by site inspection, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resources are obtained and inspected for compliance with job specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Correct materials and components for work are obtained and inspected for compliance with the job specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is planned, sequenced and prioritised, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Potential hazards are identified and risk control measures are selected, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is prepared, in accordance with workplace procedures

  1. Isolations are confirmed, where appropriate, in accordance with workplace procedures
Isolations are confirmed, where appropriate, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is tested using appropriate plans, drawings and manuals, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test conditions are confirmed and equipment is inspected to ensure absence of any damage, defect or deterioration, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is tested using approved testing techniques, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment test results are interpreted and documented, in accordance with workplace procedures

  1. Isolations are confirmed, where appropriate, in accordance with workplace procedures site requirements
Isolations are confirmed, where appropriate, in accordance with workplace procedures site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inverter system equipment is commissioned using plans, drawings and manuals, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inverter system equipment is set up, in accordance with workplace procedures, operational requirements and manufacturers' specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Testing results are interpreted and documented to ensure equipment operates within manufacturers' specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inverter system equipment is commissioned, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final inspection is carried out, in accordance with workplace procedures

  1. Work is completed and appropriate personnel are notified, in accordance with workplace procedures
Work is completed and appropriate personnel are notified, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are maintained and stored, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work completion details are finalised, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.