The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for boiler draught system operation
|
|
Safety issues related to operating and monitoring boiler draught system plant are identified, in accordance with workplace procedures and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and legislative requirements Completed |
Evidence:
|
Work requirements including work to permit are identified, in accordance with workplace procedures, from appropriate personnel and documentation |
|
Completed |
Evidence:
|
Documentation to determine boiler draught system plant status is assessed and evaluated, in accordance with workplace procedures |
|
Completed |
Evidence:
|
Inspection, preoperational checks and field preparations for boiler draught system plant service are carried out, in accordance with workplace procedures and manufacturers' recommendations |
|
Completed |
Evidence:
|
Boiler draught system plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations |
|
Completed |
Evidence:
|
Sequence for recommissioning of boiler draught system plant is determined to suit existing circumstances in accordance with workplace procedures and site requirements |
|
Completed |
Evidence:
|
Operate boiler draught systemplant
|
|
Boiler draught system plant is operated, in accordance with workplace procedures and manufacturers' operating recommendations Completed |
Evidence:
|
Boiler draught system plant is monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions |
|
Completed |
Evidence:
|
Corrective actions are taken to rectify abnormalities, in accordance with workplace procedures, industry standards and site requirements |
|
Completed |
Evidence:
|
Test plant boiler draught systemoperation
|
|
Operational tests are performed, in accordance with workplace procedures Completed |
Evidence:
|
Boiler draught system plant is observed for correct operational response, in accordance with workplace procedures |
|
Completed |
Evidence:
|
Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, boiler draught system plant integrity or personnel safety requirements |
|
Completed |
Evidence:
|
Boiler draught system plant is returned to required operational status upon completion of testing, in accordance with workplace procedures |
|
Completed |
Evidence:
|
Analyse boiler draught system plant faults
|
|
Causes of abnormal boiler draught system plant operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information Completed |
Evidence:
|
Corrective action is taken, in accordance with workplace procedures |
|
Completed |
Evidence:
|
Boiler draught system plant integrity and personnel safety is maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation |
|
Completed |
Evidence:
|
Monitor and inspect boiler draught systemplant
|
|
Boiler draught system plant to be monitored and/or inspected is physically identified, in accordance with workplace procedures Completed |
Evidence:
|
Boiler draught system plant is monitored and/or inspected, in accordance with workplace procedures, for normal operation or to detect deviations |
|
Completed |
Evidence:
|
Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected |
|
Completed |
Evidence:
|
Complete documentation
|
|
Boiler draught system plant problems, movements and status are reported, in accordance with workplace procedures Completed |
Evidence:
|
Documentation is updated, in accordance with workplace procedures |
|
Completed |
Evidence:
|