NTISthis.com

Evidence Guide: UEPOPS316 - Operate and monitor boiler steam/water cycle

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEPOPS316 - Operate and monitor boiler steam/water cycle

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and preparefor boiler steam water cycle operation

  1. Safety issues related to operating and monitoring boiler steam and water cycle plant are identified, in accordance with workplace procedures and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and legislative requirements
Safety issues related to operating and monitoring boiler steam and water cycle plant are identified, in accordance with workplace procedures and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and legislative requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work requirements, including permits to work, are identified, in accordance with workplace procedures, from appropriate personnel and documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation to determine boiler steam and water cycle plant status is assessed and evaluated, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspection, preoperational checks and field preparations for boiler steam and water cycle service are carried out, in accordance with workplace procedures and manufacturers' recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Boiler steam and water cycle plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sequence for recommissioning of boiler steam and water cycle plant is determined, in accordance with workplace procedures and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operateboiler steam/water cycle plant

  1. Boiler steam and water cycle plant is operated, in accordance with workplace procedures and manufacturers' operating recommendations
Boiler steam and water cycle plant is operated, in accordance with workplace procedures and manufacturers' operating recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Boiler steam and water cycle plant is monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective actions are taken to rectify abnormalities, in accordance with workplace procedures and industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Boiler steam and water cycle plant is identified and removed from service, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective actions are taken, in accordance with workplace procedures when boiler steam and water cycle plant abnormalities are identified during removal from service

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test boiler steam/water cycleplant operation

  1. Operational tests are performed, in accordance with workplace procedures
Operational tests are performed, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Boiler steam and water cycle plant is observed for correct operational response, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, boiler steam and water cycle plant integrity or personnel safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Boiler steam and water cycle plant is returned to required operational status upon completion of testing, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Analyse boiler steam/water cycleplant faults

  1. Causes of abnormal boiler steam and water cycle plant operating conditions are identified, in accordance with workplace procedures, and by analysing technical and operational information
Causes of abnormal boiler steam and water cycle plant operating conditions are identified, in accordance with workplace procedures, and by analysing technical and operational information

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective action is taken, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Boiler steam and water cycle plant integrity and personnel safety are maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and inspect boiler steam/water cycleplant

  1. Boiler steam and water cycle plant to be monitored and inspected is physically identified, in accordance with workplace procedures
Boiler steam and water cycle plant to be monitored and inspected is physically identified, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Boiler steam and water cycle plant is monitored and inspected, in accordance with workplace procedures for normal operation or to detect deviations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete documentation

  1. Boiler steam and water cycle plant problems, movements, abnormalities and status are reported, in accordance with workplace procedures
Boiler steam and water cycle plant problems, movements, abnormalities and status are reported, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is updated, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.