NTISthis.com

Evidence Guide: UEPOPS408 - Shut down a gas turbine

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEPOPS408 - Shut down a gas turbine

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and preparegas turbine shut down work

  1. Safety issues are identified, in accordance with Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) and workplace procedures
Safety issues are identified, in accordance with Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work requirements are identified from appropriate personnel and documentation, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operational checks are carried out on gas turbine plant in accordance with manufacturers' specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Team and individual roles and responsibilities are identified, in accordance with workplace procedures and are recorded in the shutdown plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct gas turbine shut down

  1. Gas turbine is unloaded and shut down, in accordance with manufacturers' specifications, workplace procedures, site requirements and shut down plan
Gas turbine is unloaded and shut down, in accordance with manufacturers' specifications, workplace procedures, site requirements and shut down plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gas turbine exhaust gas flow and power output are adjusted when gas turbine is a component of a combined unit, in accordance with workplace procedures, to achieve required steam flow conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gas turbine and associated power generation plant is placed in a safe condition, in accordance with manufacturers' recommendations, workplace procedures and shut down plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gas turbine plant is operated within limits of its' design, in accordance with workplace procedures during gas turbine shut down

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gas turbine plant is inspected and monitored, in accordance with workplace procedures, to detect abnormal operating conditions during shut down

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective actions are taken to rectify gas turbine plant operation abnormalities, in accordance with manufacturers' recommendations and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and test gas turbine plant operation during shutdown

  1. Tests are performed on gas turbine plant, in accordance with workplace procedures and shut down plan
Tests are performed on gas turbine plant, in accordance with workplace procedures and shut down plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gas turbine system and plant is observed for correct operational response, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective action is taken when operation response is not in accordance with shut down work plan, plant integrity or safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gas turbine plant is returned to required operational status upon completion of testing, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Analyse system faultsduring gas turbine shutdown

  1. Causes of abnormal gas turbine plant operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information
Causes of abnormal gas turbine plant operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective action is taken, in accordance with workplace procedures and shut down plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gas turbine plant integrity and personnel safety is maintained, in accordance with workplace procedures, and through consultation with appropriate personnel and technical and operational documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate personnel are notified in accordance with workplace procedures, when defects are detected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete documentation

  1. Gas turbine plant problems, movements and status are reported, in accordance with workplace procedures
Gas turbine plant problems, movements and status are reported, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is updated, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.