Evidence Guide: UEPOPS409 - Start up a boiler unit

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEPOPS409 - Start up a boiler unit

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare boiler unit start upwork

  1. Safety issues are identified in accordance with Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and workplace procedures
Safety issues are identified in accordance with Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work requirements are identified from appropriate personnel and documentation, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Preoperational checks are carried out on boiler unit plant, in accordance with manufacturers' recommendations and workplace procedures and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct boiler unit start up

  1. Boiler auxiliary systems are started up to support boiler unit start up, in accordance with manufacturers' specifications and workplace procedures
Boiler auxiliary systems are started up to support boiler unit start up, in accordance with manufacturers' specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pre-light up conditions for boiler unit are established, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Combustion is established with fuel consumption kept at minimum levels, in accordance with workplace procedures and manufacturers' recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fuel, air and feed water flows are adjusted, in accordance with workplace procedures, to achieve required steam conditions and demand

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Boiler unit plant is operated within limits of its' design, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Boiler unit plant is monitored, in accordance with workplace procedures, to detect deviations from required operating conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective actions are taken to rectify boiler unit abnormalities, in accordance with manufacturers' recommendations and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test boiler unitplant operation

  1. Tests are performed, in accordance with workplace procedures
Tests are performed, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Power generation system and boiler unit plant is observed, in accordance with workplace procedures, for correct operational response

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective action is taken, in accordance with workplace procedures, when response does not meet documentation, plant integrity or personnel safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Boiler unit plant is returned to required operational status upon completion of testing, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Analyse system faultsduring boiler unit start up

  1. Causes of abnormal boiler unit plant operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information
Causes of abnormal boiler unit plant operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective action is taken, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Boiler unit plant integrity and personnel safety is maintained, in accordance with workplace procedures and through consultation with appropriate personnel and technical and operational documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete documentation

  1. Boiler unit plant problems, movements, and status are reported, in accordance with workplace procedures
Boiler unit plant problems, movements, and status are reported, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is updated, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.