The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEPOPS410 - Shut down a boiler unit

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare boiler unit shut down work

  1. Safety issues are identified, in accordance with Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) procedures and workplace procedures
Safety issues are identified, in accordance with Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) procedures and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work requirements are identified from relevant personnel and documentation, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Preoperational checks are carried out on boiler unit plant in accordance with workplace procedures, manufacturers' recommendations and workplace procedures and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct boiler unit shut down

  1. Perform shut down of boiler unit, in accordance with manufacturers' specifications and workplace procedures.
Perform shut down of boiler unit, in accordance with manufacturers' specifications and workplace procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cool down and purge boiler unit, in accordance with manufacturers' specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Depressurise boiler unit, in accordance with manufacturers' specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective actions are taken to rectify boiler unit abnormalities, in accordance with manufacturers' recommendations and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test boiler unitplant operation

  1. Tests are performed on boiler unit, in accordance with workplace procedures
Tests are performed on boiler unit, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Power generation system and boiler unit plant is observed for correct operational response, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, boiler unit plant integrity or personnel safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Boiler unit plant is returned to required operational status upon completion of testing, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Analyse and report on system faults during boiler unit shut down

  1. Causes of abnormal boiler unit plant operating conditions are identified by analysing technical and operational information in accordance with workplace procedures
Causes of abnormal boiler unit plant operating conditions are identified by analysing technical and operational information in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective action is taken, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Boiler unit plant integrity and personnel safety is maintained, in accordance with workplace procedures, and through consultation with appropriate personnel, and technical and operational documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete documentation

  1. Boiler unit plant problems, movements and status are reported, in accordance with workplace procedures
Boiler unit plant problems, movements and status are reported, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is updated, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.