Evidence Guide: UEPOPS411 - Run up a steam turbine

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEPOPS411 - Run up a steam turbine

What evidence can you provide to prove your understanding of each of the following citeria?

Analyse system faults

  1. Causes of abnormal steam turbine plant operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information
  2. Corrective action is taken, in accordance with workplace procedures
  3. Steam turbine plant integrity and personnel safety is maintained, in accordance with workplace procedures, through consultation with appropriate personnel and technical and operational documentation
  4. Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected
Causes of abnormal steam turbine plant operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective action is taken, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Steam turbine plant integrity and personnel safety is maintained, in accordance with workplace procedures, through consultation with appropriate personnel and technical and operational documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare steam turbinework

  1. Safety issues are identified, in accordance with workplace procedures and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and site requirements
Safety issues are identified, in accordance with workplace procedures and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work requirements are identified from appropriate personnel and documentation, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Preoperational checks are carried out on steam turbine plant, in accordance with manufacturers' recommendations and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Turbine running up and loading schedule are ascertained from relevant documentation, in accordance with workplace procedures and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Take action to commencerun up steam turbine

  1. Steam turbine and generator auxiliary systems are made available to support steam turbine run up, in accordance with manufacturers' specifications and workplace procedures
Steam turbine and generator auxiliary systems are made available to support steam turbine run up, in accordance with manufacturers' specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Steam turbine plant is monitored to detect deviations from normal operating conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective actions are taken to rectify steam turbine abnormalities, in accordance with manufacturers' specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Steam generator is synchronised and connected to electrical system, in accordance with workplace procedures and manufacturers' recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test steam turbineplant operation

  1. Tests are performed, in accordance with workplace procedures
Tests are performed, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Power generation system and steam turbine plant are observed for correct operational response, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective action is taken when response does not meet documentation, steam turbine plant integrity or personnel safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Steam turbine plant is returned to required operational status upon completion of testing, in accordance with workplace procedures

  1. Causes of abnormal steam turbine plant operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information
Causes of abnormal steam turbine plant operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective action is taken, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Steam turbine plant integrity and personnel safety is maintained, in accordance with workplace procedures, through consultation with appropriate personnel and technical and operational documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete documentation

  1. Steam turbine plant problems, movements and status are reported, in accordance with workplace procedures
Steam turbine plant problems, movements and status are reported, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is updated, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.