Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEPOPS512 - Manage high voltage network system

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare network systemoperations

  1. Information and documentation to determine power generation network system status is assessed and evaluated, in accordance with High Voltage (H.V.) system operating requirements
Information and documentation to determine power generation network system status is assessed and evaluated, in accordance with High Voltage (H.V.) system operating requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Power generation network system and associated equipment operational prerequisites are established, in accordance with H.V. system operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sequence for operation of power generation network system sections and equipment is created for a range of potential scenarios, in accordance with H.V. system operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Power generation network system forecast is based on assessment of data and relevant information, in accordance with H.V. system operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Manage and control network system

  1. Power generation network system is operated and managed, in accordance with H.V. system operating procedures
Power generation network system is operated and managed, in accordance with H.V. system operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Power generation network system demand is managed using a contingency plan and strategies to maintain quality of supply, in accordance with legislative requirements and H.V. system operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Power generation network system voltage and current requirements are assessed, evaluated and managed to maintain stability and H.V. system integrity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Voltage load profiles are identified and adhered to, in accordance with power generation network system, to minimise transmission losses

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Power generation network system load shedding sequence and priorities are monitored and managed, to ensure H.V. system integrity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Power generation network system data is monitored and managed, for normal operation or to detect deviations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective actions to rectify abnormalities in power generation network system are implemented, following assessment of data, in accordance with H.V. system operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resources to meet power generation network system requirements are managed, in accordance with H.V. system operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Analyse and respond to network system faults

  1. Causes of power generation abnormal network system operating conditions are identified by analysing technical and operational information, in accordance with H.V. system operating procedures
Causes of power generation abnormal network system operating conditions are identified by analysing technical and operational information, in accordance with H.V. system operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operation and management of power generation network system protection program is evaluated to determine nature and cause of faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communication with key stakeholders is established managed, to assist in identifying nature and source of H.V. system interference

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective action is taken, in accordance with H.V. system operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Power generation network system integrity and personnel safety are managed, in accordance with H.V. system operating procedures, and in consultation with appropriate personnel and technical and operational documentation including contingency plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review incident response and preventative procedures

  1. Power generation facility network system incident responses are assessed and reviewed, in accordance with system operating procedures
Power generation facility network system incident responses are assessed and reviewed, in accordance with system operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Alternative responses to contingencies are identified and assessed, in accordance with system operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Alternative responses to contingencies are documented and managed, in accordance with system operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete documentation

  1. Network system problems, movements and status is reported, in accordance with workplace and system operating procedures
Network system problems, movements and status is reported, in accordance with workplace and system operating procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is updated, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.