Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEPOPS514 - Control hydro generation pumping

What evidence can you provide to prove your understanding of each of the following citeria?

Maintain key indicator limits

  1. Pond levels, power station discharges, plant voltage and current limits, frequency and time errors are maintained, in accordance with workplace procedures and manufacturers' specifications
Pond levels, power station discharges, plant voltage and current limits, frequency and time errors are maintained, in accordance with workplace procedures and manufacturers' specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hydro generation plant is run at peak efficiency, or to the load schedule, avoiding rough running zones, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate remote hydro plant

  1. Hydro generation power plant is remotely stopped, started, loaded and unloaded, in accordance with workplace procedures and the operating regimes dictated by the electricity generation schedule
Hydro generation power plant is remotely stopped, started, loaded and unloaded, in accordance with workplace procedures and the operating regimes dictated by the electricity generation schedule

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Power generating plant is remotely switched in and out of synchronous condenser operation, as required, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain policiesand procedures

  1. Communication procedures used to alert public of increased river flows, in accordance with workplace procedures
Communication procedures used to alert public of increased river flows, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Minimum river flows are maintained, in accordance with workplace procedures and agreed limits

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Water storage levels are monitored and maintained, in accordance with workplace procedures, legislative requirements and policy guidelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete documentation

  1. Equipment problems, movements, and status are reported, in accordance with workplace procedures
Equipment problems, movements, and status are reported, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is updated, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.