The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan for plant operation
|
|
Safety issues are identified to comply with enterprise/site requirements Completed |
Evidence:
|
Work, plant and resource requirements are identified from relevant information and documentation Completed |
Evidence:
|
Pre operational checks are carried out in accordance with enterprise and site requirements Completed |
Evidence:
|
Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training Completed |
Evidence:
|
Operate generator and excitation system
|
|
System is operated in accordance with enterprise/site and manufacturer’s operating procedures Completed |
Evidence:
|
Synchronising requirements are assessed, evaluated and achieved to ensure machine/system stability during synchronising Completed |
Evidence:
|
System is monitored and observed to detect deviations from normal operating conditions Completed |
Evidence:
|
Corrective actions are taken to rectify abnormalities in accordance with manufacturer’s and enterprise/site procedures Completed |
Evidence:
|
Control generation of electrical energy
|
|
Generator output is adjusted to meet demand whilst observing operating requirements Completed |
Evidence:
|
Reactive power generation and voltage regulation requirements are assessed and the system is controlled to achieve the desired output Completed |
Evidence:
|
Generator stabilities and operating limits are assessed and the system is controlled to maintain those limits tin accordance with enterprise/site and manufacturer’s procedures Completed |
Evidence:
|
Generator cooling systems and limits are monitored and assessed and excitation system is controlled to maintain those limits in accordance with enterprise/site and manufacturer’s procedures Completed |
Evidence:
|
Coordinate generation control
|
|
Load sharing between multiple generators is controlled to maintain optimum efficiency and plant reliability Completed |
Evidence:
|
Output of generators is adjusted to meet demand whilst observing operating requirements Completed |
Evidence:
|
System/plant key indicators are monitored and adjusted to maintain within limits and detect deviations from normal operating conditions Completed |
Evidence:
|
Corrective actions taken to rectify system abnormalities are in accordance with manufacturer’s, enterprise/site requirements Completed |
Evidence:
|
System integrity, personal safety and continuity of supply are maintained throughout. Completed |
Evidence:
|
Consultation with appropriate personnel is undertaken as required in accordance with enterprise/ site requirements. Completed |
Evidence:
|
Systems are operated at optimum efficiency Completed |
Evidence:
|
Monitor system/plant
|
|
System/plant to be monitored is physically identified Completed |
Evidence:
|
System/plant is monitored for normal operation or to detect deviations Completed |
Evidence:
|
Corrective action taken is in accordance with enterprise/site procedures Completed |
Evidence:
|
Appropriate personnel are notified when defects and abnormal operating conditions are detected Completed |
Evidence:
|
Analyse system/plant faults
|
|
Causes of abnormal system operating conditions are identified by analysing the technical and operational information in a logical and sequential manner Completed |
Evidence:
|
Actions necessary to rectify fault are correctly determined Completed |
Evidence:
|
System/plant integrity and personnel safety are maintained through consultation with appropriate personnel, and reference to plant, technical and operational documentation Completed |
Evidence:
|
Appropriate personnel are arranged for local investigation of identified operational abnormalities Completed |
Evidence:
|
Complete documentation
|
|
Documentation is updated and plant problems, movements, abnormalities and status are reported and logged in accordance with enterprise/site procedures Completed |
Evidence:
|