NTISthis.com

Evidence Guide: UETDRTO017 - String overhead transmission conductors

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UETDRTO017 - String overhead transmission conductors

What evidence can you provide to prove your understanding of each of the following citeria?

Complete the work

  1. Completed work is checked for compliance against the work plan and workplace requirements
  2. Incidents or unplanned events are reported in accordance with workplace requirements
  3. Worksite is rehabilitated, cleaned and made safe in accordance with workplace requirements
  4. Plant, tools and equipment are cleaned, checked and returned to storage in accordance with workplace requirements
  5. Surplus materials are returned to storage or disposed of in accordance with workplace requirements
  6. Work permits are signed off in accordance with workplace requirements
  7. Personnel are notified of work completion in accordance with workplace requirements
Completed work is checked for compliance against the work plan and workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Incidents or unplanned events are reported in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is rehabilitated, cleaned and made safe in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plant, tools and equipment are cleaned, checked and returned to storage in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Surplus materials are returned to storage or disposed of in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work permits are signed off in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Personnel are notified of work completion in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare to string the overhead transmission conductors

  1. Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are referred to and confirmed
Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are referred to and confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work plan is obtained and confirmed in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials required for work are determined and obtained in accordance with work plan and workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plant, tools, equipment and personal protective equipment (PPE) required for work are determined, obtained and confirmed in working order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks are assessed and control measures identified and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety observer role and responsibilities are discussed and confirmed in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communication method between the workers and safety observer is determined and confirmed in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safe approach distances for the work to be performed are determined and confirmed in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is prioritised and sequenced for completion in accordance with work plan and workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work permits are signed in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is prepared in accordance with the work plan and workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Traffic management plan is confirmed as being in place in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out stringing of overhead transmission conductors

  1. Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are applied and monitored
Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are applied and monitored

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lifting, working at heights and the use of plant, tools, equipment and PPE are carried out in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazard control measures are monitored in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety observer is positioned to observe the work in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communication methods between workers and safety observer are used in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safe approach distances are maintained when the work is being performed in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stringing of overhead transmission conductors prior to terminating is performed in accordance with work plan, drawings and workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Incidents or unplanned events are responded to in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality checks of work are undertaken in accordance with work plan and workplace requirements

  1. Completed work is checked for compliance against the work plan and workplace requirements
Completed work is checked for compliance against the work plan and workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Incidents or unplanned events are reported in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is rehabilitated, cleaned and made safe in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plant, tools and equipment are cleaned, checked and returned to storage in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Surplus materials are returned to storage or disposed of in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work permits are signed off in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Personnel are notified of work completion in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to string the overhead transmission conductors

1.1

Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are referred to and confirmed

1.2

Work plan is obtained and confirmed in accordance with workplace requirements

1.3

Materials required for work are determined and obtained in accordance with work plan and workplace requirements

1.4

Plant, tools, equipment and personal protective equipment (PPE) required for work are determined, obtained and confirmed in working order

1.5

Hazards are identified, risks are assessed and control measures identified and applied

1.6

Safety observer role and responsibilities are discussed and confirmed in accordance with workplace requirements

1.7

Communication method between the workers and safety observer is determined and confirmed in accordance with workplace requirements

1.8

Safe approach distances for the work to be performed are determined and confirmed in accordance with workplace requirements

1.9

Work is prioritised and sequenced for completion in accordance with work plan and workplace requirements

1.10

Work permits are signed in accordance with workplace requirements

1.11

Worksite is prepared in accordance with the work plan and workplace requirements

1.12

Traffic management plan is confirmed as being in place in accordance with workplace requirements

2

Carry out stringing of overhead transmission conductors

2.1

Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are applied and monitored

2.2

Lifting, working at heights and the use of plant, tools, equipment and PPE are carried out in accordance with workplace requirements

2.3

Hazard control measures are monitored in accordance with workplace requirements

2.4

Safety observer is positioned to observe the work in accordance with workplace requirements

2.5

Communication methods between workers and safety observer are used in accordance with workplace requirements

2.6

Safe approach distances are maintained when the work is being performed in accordance with workplace requirements

2.7

Stringing of overhead transmission conductors prior to terminating is performed in accordance with work plan, drawings and workplace requirements

2.8

Incidents or unplanned events are responded to in accordance with workplace requirements

2.9

Quality checks of work are undertaken in accordance with work plan and workplace requirements

3

Complete the work

3.1

Completed work is checked for compliance against the work plan and workplace requirements

3.2

Incidents or unplanned events are reported in accordance with workplace requirements

3.3

Worksite is rehabilitated, cleaned and made safe in accordance with workplace requirements

3.4

Plant, tools and equipment are cleaned, checked and returned to storage in accordance with workplace requirements

3.5

Surplus materials are returned to storage or disposed of in accordance with workplace requirements

3.6

Work permits are signed off in accordance with workplace requirements

3.7

Personnel are notified of work completion in accordance with workplace requirements

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to string the overhead transmission conductors

1.1

Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are referred to and confirmed

1.2

Work plan is obtained and confirmed in accordance with workplace requirements

1.3

Materials required for work are determined and obtained in accordance with work plan and workplace requirements

1.4

Plant, tools, equipment and personal protective equipment (PPE) required for work are determined, obtained and confirmed in working order

1.5

Hazards are identified, risks are assessed and control measures identified and applied

1.6

Safety observer role and responsibilities are discussed and confirmed in accordance with workplace requirements

1.7

Communication method between the workers and safety observer is determined and confirmed in accordance with workplace requirements

1.8

Safe approach distances for the work to be performed are determined and confirmed in accordance with workplace requirements

1.9

Work is prioritised and sequenced for completion in accordance with work plan and workplace requirements

1.10

Work permits are signed in accordance with workplace requirements

1.11

Worksite is prepared in accordance with the work plan and workplace requirements

1.12

Traffic management plan is confirmed as being in place in accordance with workplace requirements

2

Carry out stringing of overhead transmission conductors

2.1

Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are applied and monitored

2.2

Lifting, working at heights and the use of plant, tools, equipment and PPE are carried out in accordance with workplace requirements

2.3

Hazard control measures are monitored in accordance with workplace requirements

2.4

Safety observer is positioned to observe the work in accordance with workplace requirements

2.5

Communication methods between workers and safety observer are used in accordance with workplace requirements

2.6

Safe approach distances are maintained when the work is being performed in accordance with workplace requirements

2.7

Stringing of overhead transmission conductors prior to terminating is performed in accordance with work plan, drawings and workplace requirements

2.8

Incidents or unplanned events are responded to in accordance with workplace requirements

2.9

Quality checks of work are undertaken in accordance with work plan and workplace requirements

3

Complete the work

3.1

Completed work is checked for compliance against the work plan and workplace requirements

3.2

Incidents or unplanned events are reported in accordance with workplace requirements

3.3

Worksite is rehabilitated, cleaned and made safe in accordance with workplace requirements

3.4

Plant, tools and equipment are cleaned, checked and returned to storage in accordance with workplace requirements

3.5

Surplus materials are returned to storage or disposed of in accordance with workplace requirements

3.6

Work permits are signed off in accordance with workplace requirements

3.7

Personnel are notified of work completion in accordance with workplace requirements

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least two separate occasions and include:

applying relevant legislation, regulations, standards, codes of practice and organisational workplace requirements, including:

work health and safety (WHS)/occupational health and safety (OHS) requirements

safe approach distances

identifying hazards; assessing risks; and identifying, applying and monitoring control measures

obtaining, inspecting and using relevant personal protective equipment (PPE)

creating an equipotential work zone

stringing conductors

using at least five (5) of the following stringing equipment:

crimping equipment

conductor winches

lever hoist

conductor trailers/jinker

pre-formed splices

conductor drum stands

draw wire

rollers/sheaves

conductor grip

conductor stockings

swivels

dealing with an unplanned event on at least one (1) occasion

signing on and off relevant work permits in accordance with workplace requirements.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

relevant legislation, regulations, standards, codes of practice and organisational workplace requirements, including:

WHS/OHS

safe approach distances

hazard, risk assessment and risk control requirements, including potential hazards of:

induced voltages

types and application of PPE

safe use of plant, tools and equipment

application, purpose and types of permits

events constituting an unplanned event or incident

procedures for responding to an unplanned event or incident

construction manuals, system diagrams/plans and drawings

role and responsibilities of a safety observer

conductor types and characteristics

construction clearances

stringing methods.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UET Transmission, Distribution and Rail Sector Training Package Companion Volume Implementation Guide.