Evidence Guide: UETTDRDP15 - Inspect, maintain and restore energised low voltage overhead distribution network infrastructure

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UETTDRDP15 - Inspect, maintain and restore energised low voltage overhead distribution network infrastructure

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for the inspection, maintenance and restoration of overhead distribution network infrastructure

  1. Works schedule(s), including drawings, plans, requirements, established procedures and material lists, are received, analysed and confirmed, as necessary, by site inspection
Works schedule(s), including drawings, plans, requirements, established procedures and material lists, are received, analysed and confirmed, as necessary, by site inspection

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant requirements and established procedures for the work are communicated to all personnel and identified for all worksites

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work health and safety (WHS)/occupational health and safety (OHS) policies and procedures related to requirements and established procedures for the inspection of overhead structures and electrical apparatus used on poles and/or structures, the maintenance of overhead energised LV conductors and cables and LV switching, are obtained and confirmed for the purposes of the work to be performed and communicated

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Physical loads and calculations are confirmed according to requirements using essential knowledge and appropriate skill

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is prioritised and sequenced following consultation with others for completion within acceptable timeframes and in accordance with established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, WHS/OHS risks assessed and control measures prioritised, implemented and monitored, including emergency exits kept clear according to established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permits are obtained to access and perform work according to requirements and/or established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resources, including personnel, equipment, tools and personal protective equipment (PPE), required for the job are obtained and confirmed in working order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Specialist equipment for live work is inspected and confined in working order in accordance with requirements and established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant personnel at worksite are confirmed current in first aid, pole top rescue and other related work procedures according to requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Liaison and communication issues with other/authorised personnel, authorities, clients and land owners are resolved to carry out work where necessary

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site is prepared according to the work schedule and to minimise risk and damage to property, commerce and individuals in accordance with established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities confirmed, where applicable, in accordance with established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Traffic management plan is identified and implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out inspection, maintenance and restoration of overhead distribution network infrastructure

  1. WHS/OHS, sustainable energy and environmental principles and practices to reduce the incidents of accidents and minimise waste are monitored and followed in accordance with requirements and/or established procedures
WHS/OHS, sustainable energy and environmental principles and practices to reduce the incidents of accidents and minimise waste are monitored and followed in accordance with requirements and/or established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lifting, climbing, working in confined spaces and aloft, and use of power tools/equipment, techniques and practices are safely followed, and currency according to requirements confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Essential knowledge and associated skills are applied in the safe maintenance and restoration of overhead distribution network infrastructure to ensure completion in an agreed timeframe and to quality standards with a minimum of waste according to requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspection of overhead structures and electrical apparatus used on poles and/or structures is carried out in accordance with the work schedule and requirements/established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance, including repair and/or replacement of poles and/or structures, is carried out in accordance with the work schedule and requirements/established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communications with Switching Control Officer are established and maintained throughout the isolation operation according to established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Electrical equipment and associated circuits line/network or worksite to be switched, including paralleling, is isolated and proved de-energised using appropriate devices and earthed, where required, according to requirements and established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are reported to the immediate authorised persons for directions according to established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned events during the inspection, maintenance or switching procedures are undertaken within the scope of established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Known solutions to a variety of problems are applied using acquired essential knowledge and associated skills

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ongoing checks of quality of the work are undertaken in accordance with instructions and established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete the inspection, maintenance and restoration of overhead distribution network infrastructure

  1. Work undertaken is checked against works schedule for conformance with requirements and anomalies reported in accordance with established procedures
Work undertaken is checked against works schedule for conformance with requirements and anomalies reported in accordance with established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accidents and/or injuries are reported in accordance with requirements/established procedures, where applicable

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is rehabilitated, cleaned up and made safe in accordance with established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage or disposed of in accordance with established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permits are signed off and overhead structures and electrical apparatus used on poles and/or structures are returned to service in accordance with requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Works completion records, reports, as installed/modified drawing and/or documentation and information are finalised and processed and appropriate personnel notified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.