Evidence Guide: UETTDRIS81 - Install telecommunications infrastructure on electricity supply industry assets

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UETTDRIS81 - Install telecommunications infrastructure on electricity supply industry assets

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for the installation of telecommunications infrastructure equipment

  1. Work schedules, including drawings, plans, requirements, established procedures and material lists, are received
Work schedules, including drawings, plans, requirements, established procedures and material lists, are received

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant requirements and established procedures for the work are communicated to relevant personnel and identified for the worksite

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work health and safety (WHS)/occupational health and safety (OHS) policies and procedures related to requirements and established procedures for the installation of telecommunications infrastructure equipment are obtained and confirmed for the purposes of the work to be performed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is prioritised and sequenced following consultation with supervisor for completion within acceptable timeframes and in accordance with established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, WHS/OHS risks assessed and control measures prioritised, implemented and monitored according to established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permits are received to access and perform work according to requirements and/or established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resources, including equipment, tools and personal protective equipment (PPE), required for the job are obtained and confirmed in working order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant personnel at worksite are confirmed with currency in first aid, pole top rescue and other related work procedures according to requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site is prepared in accordance with established procedures to minimise risk and damage to property, commerce and individuals

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out installation of telecommunications infrastructure equipment

  1. WHS/OHS and sustainable energy principles and practices to reduce waste are monitored and followed in accordance with requirements and/or established procedures
WHS/OHS and sustainable energy principles and practices to reduce waste are monitored and followed in accordance with requirements and/or established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lifting, climbing, working at heights, and use of power tools/equipment, techniques and practices are safely followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Essential knowledge and associated skills are applied to the safe installation of telecommunications infrastructure equipment to ensure completion in an agreed timeframe, to quality standards with a minimum of waste according to requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Telecommunications infrastructure equipment and associated hardware are positioned, secured and terminated/connected in accordance with requirements and established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Telecommunications infrastructure equipment and associated hardware are maintained in accordance with requirements and established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned events in the installation of telecommunications infrastructure equipment are resolved and dealt with

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Known solutions to a variety of problems are applied using acquired essential knowledge and associated skills

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ongoing checks of quality of the work are undertaken in accordance with instructions and established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete the installation of telecommunications infrastructure equipment

  1. Work undertaken is checked against work schedule for conformance with requirements and anomalies reported in accordance with established procedures
Work undertaken is checked against work schedule for conformance with requirements and anomalies reported in accordance with established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accidents and/or injuries are reported in accordance with requirements/established procedures, where applicable

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is rehabilitated, cleaned up and made safe in accordance with established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and any surplus resources and materials are cleaned, checked and returned to storage in accordance with established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permits are signed off in accordance with established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work completion records, reports, as installed/modified drawings and/or documentation and information are finalised and processed and appropriate personnel notified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.