Operate a high grade fugal station

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver FBPSUG2015, 'Operate a high grade fugal station'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Operate a high grade fugal station' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

Elements

Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare the high grade fugal station for operation

1.1 Confirm massecuite is available to meet production requirements

1.2 Confirm services are available and ready for operation

1.3 Check equipment in readiness for use according to operating specifications

1.4 Select, fit and use personal protective equipment according to workplace safety procedures

1.5 Set the process to meet production requirements

2. Operate and monitor high grade fugal station

2.1 Start and operate the high grade fugal station according to operating procedures

2.2 Confirm process performance is maintained within specification

2.3 Ensure output meets specification

2.4 Monitor equipment to confirm operating condition

2.5 Identify, rectify or report product, process and equipment non-conformance according to workplace procedures

3. Hand over the high grade fugal station

3.1 Maintain workplace records according to workplace requirements

3.2 Carry out handover according to workplace procedures

3.3 Ensure operators are aware of system and related equipment status at completion of handover

4. Shut down the high grade fugal station

4.1 Identify the appropriate shutdown procedure for operational and long-term shutdown conditions

4.2 Safely shut down the system according to operating procedures

4.3 Prepare the high grade fugal system for storage in shutdown mode

4.4 Identify and report operational maintenance requirements according to workplace procedures