Install patterned and mosaic parquetry flooring

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver MSFFL3083, 'Install patterned and mosaic parquetry flooring'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Install patterned and mosaic parquetry flooring' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

Elements

Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for work

1.1 Identify and follow work health and safety, legislative and organisational requirements

1.2 Correctly identify work requirements and process from review of documentation

1.3 Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations

1.4 Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.5 Remove or undercut skirting boards or cover trims, and store for re-fitting in accordance with work requirements

1.6 Plan sequence of work, and starting point, to ensure efficiency and quality of installation

2. Set out mosaic parquetry flooring

2.1 Inspect timber flooring material and confirm species, grade, size and quantity against work orders

2.2 Moisture check timber using required equipment and confirm suitability of moisture content for site conditions as per pre-site inspection procedures

2.3 Organise block parquetry flooring for fixing and use in accordance with safety management requirements

2.4 Prepare required adhesives and edge strips in accordance with manufacturer instructions

2.5 Accurately measure area to be covered and establish working lines and starting point

3. Lay out and cut parquetry mosaic fingers

3.1 Follow instructions and sequence for laying and fixing

3.2 Lay appropriate underlay in accordance with manufacturer recommendations

3.3 Lay out block parquetry flooring to meet directional sequence, pattern match, specification requirements, minimising waste and joins

3.4 Maximise the aesthetics of the materials, including matching grains and colours

3.5 Accurately and clearly mark parquetry fingers or panels for cutting

3.6 Cut parquetry fingers or panels to provide appropriate size and shape ensuring minimum waste

4. Install parquetry

4.1 Use required adhesives and edge strips and/or accessories in accordance with manufacturer instructions

4.2 Follow manufacturer recommendations for fixing methods and equipment

4.3 Install and fix parquetry to produce required pattern

4.4 Allow appropriate field and perimeter expansion joints

4.5 Fit and/or re-fit skirting boards or cover trims and finish

4.6 Inspect finished job and rectify any imperfections following workplace procedures

5. Complete housekeeping

5.1 Store and recycle unused materials in accordance with workplace procedures

5.2 Check, clean and store tools and equipment in accordance with workplace procedures

5.3 Clean work area and dispose of rubbish safely

5.4 Accurately complete required workplace documentation