Operate a vehicle loading crane

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver RIIHAN307E, 'Operate a vehicle loading crane'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Operate a vehicle loading crane' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for vehicle loading crane operations

1.1 Access, interpret and apply crane operation documentation and procedures to ensure work activity is compliant

1.2 Obtain, interpret, clarify and confirm work requirements

1.3 Identify hazards and environmental issues assess the risks and implement control measures in line with workplace policies and procedures

1.4 Select and wear personal protective equipment required for work activities

1.5 Identify and display signage and erect barricades to isolate the work area in line with workplace procedures

1.6 Identify and select required vehicle loading crane equipment, and confirm suitability for work activities

1.7 Identify and confirm load to be shifted according to workplace procedures

1.8 Communicate with dogman and confirm attachments are assembled and quantity of load is in line with workplace procedures, specifications, vehicle limitations and/or rigging requirements

1.9 Determine and implement no-go zones, confirm work area is clear and identify and control crane operating hazards prior to the commencement of the lift in line with workplace procedures

1.10 Coordinate and communicate planned activities in line with work requirements, including using recommended load moving signals

2. Operate vehicle loading crane in line with established requirements to complete work activity

2.1 Perform pre-start and start-up checks and vehicle positioning procedures in line with workplace procedures

2.2 Identify faults and rectify within scope of own responsibility and according to workplace procedures

2.3 Ensure load and equipment are secure and stable in line with workplace procedures

2.4 Lift to re-position loads using crane controls and techniques suited to equipment capabilities, site and work conditions, and according to workplace procedures

2.5 Monitor load, and crane hook movements and locations throughout the load transfer

2.6 Monitor hazards and risks during operations, including potential emergency situations, and respond accordingly

2.7 Monitor and manage equipment performance using indicators and alarms

2.8 Park up, shut down, secure and carry out post operational inspection of equipment in line with workplace procedures

3. Conduct housekeeping activities

3.1 Clean, check and store plant, tools and equipment as per workplace procedures

3.2 Clear work area and dispose of reused or recycled fluids and materials as per workplace procedures

3.3 Manage and/or report hazards to maintain a safe working environment

3.4 Complete and file or distribute documentation