Apply and monitor the ground control management plan

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver RIIMEX407, 'Apply and monitor the ground control management plan'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Apply and monitor the ground control management plan' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and prepare for the assessment and management of ground conditions

1.1 Obtain, interpret and confirm work requirements

1.2 Access, interpret and apply documentation required for applying and monitoring the ground control management plan

1.3 Identify and interpret ground control management plan requirements relevant to own job role

1.4 Evaluate historical information on ground conditions, and identify hazards according to workplace procedures

1.5 Confirm the work activity is compliant with the pit design and workplace procedures

1.6 Identify and address potential hazards and environmental factors and prepare to implement control measures

1.7 Select and wear personal protective equipment appropriate for work activities

1.8 Identify, obtain and allocate resources required for the application of the ground control management plan

1.9 Identify training needs of team members and prepare training plans

1.10 Obtain and interpret emergency procedures and prepare to respond to emergencies according to site requirements

2. Inspect and assess ground conditions

2.1 Determine and implement appropriate control measures for conducting geotechnical inspections

2.2 Inspect work areas and identify and record geological hazards, geotechnical risk factors and signs of instability in accordance with workplace procedures

2.3 Identify and schedule infrastructure repair and maintenance activities to reduce geotechnical risk

2.4 Report geotechnical hazards and risks outside scope of responsibility to relevant personnel in accordance with workplace procedures

2.5 Complete and submit written report of geotechnical inspection results and corresponding actions to relevant personnel

2.6 Communicate geotechnical risks and control measures to relevant personnel

3. Monitor extraction operations

3.1 Communicate, apply and monitor approved extraction method according to workplace procedures and approved engineering design

3.2 Monitor hazards and risks to confirm the safe operation of personnel, and plant and equipment

3.3 Monitor the implementation of the control measures to address geotechnical risk

3.4 Identify, assess and adjust operational activities impacting on ground stability

3.5 Identify and report indications/events of ground failure

3.6 Install barricades and warning signs where area cannot be made safe according to job and site requirements and report to relevant personnel

3.7 Apply emergency response and evacuation plans and procedures as required

3.8 Record and report on activities, issues and corrective actions

4. Monitor stockpile and dump formation and reclaiming systems

4.1 Identify, interpret and confirm stockpile and dump requirements

4.2 Monitor and report stockpile and dump configurations to conform compliance with geotechnical design

4.3 Monitor stockpile and dump operations to confirm safe work practices are implemented to control geotechnical risk in accordance with workplace procedures

5. Monitor water management procedures

5.1 Identify, interpret and assess surface and groundwater information

5.2 Monitor the implementation and performance of the drainage system

6. Contribute to ground control management plan review

6.1 Monitor and report on effectiveness of operating procedures

6.2 Submit recommendations to improve the safety, efficiency and effectiveness of ground control systems

6.3 Contribute to audit and review requirements for the ground control management plan