Assist coil tube drilling

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver RIINHB220, 'Assist coil tube drilling'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Assist coil tube drilling' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and prepare to assist coiled tubing

1.1 Obtain, interpret and confirm work requirements

1.2 Access, interpret and apply documentation required to assist coil tube drilling operations and confirm work activity is compliant

1.3 Identify and minimise environmental issues and potential hazards, and assess and address risks within scope of own role and according to workplace procedures

1.4 Select and wear personal protective equipment required for work activity

1.5 Communicate with other personnel at site according to work requirements and confirm briefings and handover details are communicated and received

1.6 Check, fit and replace restraining devices on all pressure hoses as required

1.7 Raise alarm and report as required

2. Assist storage reel installation

2.1 Position crane hook to centre of storage reel

2.2 Hoist the storage reel over the centre of the carrier and lower into saddles

2.3 Lock down storage reel with retainer brackets and set tension screws

2.4 Install circulating equipment

3. Assist storage reel removal

3.1 Remove mud tank side hoses, swivel and cross over

3.2 Line up saddles and cut excess coil tubing on rig floor with casing cutter

3.3 Align saddles to remove storage reel

3.4 Install dog nut and chain coil

3.5 Cut coil tubing

3.6 Open level wind box, shut off motor and lockout rig and open storage reel saddles

3.7 Remove lockout and prepare to pick up coil

3.8 Measure amount of coil cut and record remaining length

4. Assist installation of tubing snake connector

4.1 Prepare coil tubing ends

4.2 Check the o-rings for die retention are not stretched out

4.3 Separate two-piece tubing snake connector in middle at the threads

4.4 Size, install and tighten threaded half of tubing snake connector into tail end of coil tubing on the storage reel

4.5 Size, install and tighten threaded half of tubing snake connector into tail end of coil tubing on the injector side

4.6 Align tubing connector up and screw two tubing stake connector pieces together at centre treads

5. Assist handling of tubing snake connector

5.1 Inspect derrick and rig floor for equipment

5.2 Monitor workplace and communicate with driller as required while conducting slip and cut of coil

5.3 Run coil with tubing snake connector and confirm safe distance of injector from iron roughneck and other objects

6. Assist installation of set screw tubing dimple

6.1 Prepare coil tubing end with a grinder

6.2 Install dimple template

6.3 Tighten all set screws on dimple template

6.4 Loosen screws and remove template

6.5 Deepen template indents with a drill to dimple screw depth

6.6 Inspect tubing dimple seals

6.7 Install tubing dimple

6.8 Install dimple set screws

7. Assist bottom hole assembly operations

7.1 Prepare subs for use

7.2 Place float on bit and install bit sub onto bit

7.3 Stab drill collar in bit sub and make up drill collar into bit sub

7.4 Pick up sub and position where needed for stabbing into stump

7.5 Guide driller stabbing the dimple into the bottom hole assembly on the stump and confirm dimple is lined up to prevent from cross threading

7.6 Apply make-up tong to dimple while making up bottom hole assembly

7.7 Apply breakout tong to dimple and make up tong to BHA and torque to specifications

8. Assist tripping in with coil tubing

8.1 Confirm the lube tube is down and air bag inflated on flow T

8.2 Confirm arch pin is retracted while tripping in and free movement of the arch

8.3 Grease and inspect injector as per industry standards

9. Assist tripping out with coil tubing

9.1 Verify level wind is lined up ready to trip out

9.2 Check the air bag on flow T is still inflated

9.3 Verify level wind continuously stays in with coil while tripping out

9.4 Assist lifting the lube tube when bottom hole assembly reaches 75 metres prior to pulling out of hole

10. Assist slipping and cutting of coil tubing-grinder/rod cutter

10.1 Place tubing dimple at the desired working height

10.2 Place the hole cover in position

10.3 Removing tubing dimple

10.4 Run coil tubing through table to acceptable height while taking precautions to reduce stress on coil

10.5 Cut coil tubing with grinder/rod cutter

10.6 Remove with double wrapping sling and wire line

10.7 Lay down through v door.

10.8 Measure length cut off to keep accurate length