Install de-watering conduit and gas drainage equipment

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver RIINHB319D, 'Install de-watering conduit and gas drainage equipment'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Install de-watering conduit and gas drainage equipment' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

1. Plan and prepare for installation of de-watering conduit and gas drainage equipment

1.1 Access, interpret and apply de-watering conduit and gas drainage equipment documentation and the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Communicate and coordinate activities with others throughout the work activity

1.6 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

1.7 Prepare the de-watering conduit installation plan in consultation with the site gas drainage official and in accordance with appropriate site management plans

2. Install de-watering conduit and monitor water drainage

2.1 Carry out any pre-start and start up procedures

2.2 Identify, select and apply rig operational controls

2.3 Insert hollow rods into the hole

2.4 Attach non-return valve and anchor onto the de-watering conduit

2.5 Perforate the conduit at the appropriate locations to allow ingress of water

2.6 Install the de-watering conduit into hollow rod to the required distance

2.7 Identify and remedy operational problems

2.8 Remove hollow rods leaving conduit in place

2.9 Connect conduit to de-watering system and commence removing water via the water trap

2.10 Empty water trap

2.11 Disconnect de-watering equipment from the de-watering conduit when all water has been removed

2.12 Monitor, record and interpret all pressure and flow readings

2.13 Continually monitor hazards and risks , and ensure safety of self, other personnel, plant and equipment

3. Connect gas drainage equipment and monitor gas drainage

3.1 Select and install appropriate gas drainage equipment

3.2 Select and use appropriate measuring equipment to monitor gas drainage

3.3 Correctly identify and tag gas drainage and monitoring units identifying the number, length and diameter of the hole

4. Complete equipment maintenance and housekeeping

4.1 Carry out any shutdown and securing of equipment

4.2 Ensure that the drill rods are inspected for wear and damage, threads dressed and greased, and rods are replace as required

4.3 Monitor all drill equipment and hoses and ancillary equipment and carryout remedial action

4.4 Ensure all drilling equipment is cleaned and maintained

4.5 Ensure housekeeping activities are completed

4.6 Process records


Qualifications and Skillsets

RIINHB319D appears in the following qualifications:

  • RII31813 - Certificate III in Drilling Operations
  • RII31815 - Certificate III in Drilling Operations