Conduct coil tube drilling

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver RIINHB326, 'Conduct coil tube drilling'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Conduct coil tube drilling' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and prepare for coiled tubing

1.1 Obtain, confirm and apply work instructions

1.2 Access, interpret and apply coil tube drilling documentation and confirm work activity is compliant

1.3 Identify and minimise environmental issues and potential hazards, and assess and address risks within scope of own role and according to workplace procedures

1.4 Select and wear personal protective equipment required for work activities

1.5 Communicate with other personnel at site according to work requirements and confirm briefings and handover details are communicated and received

1.5 Select equipment, tools and equipment required to carry out tasks, check for serviceability and rectify or report any faults within scope of own role

1.6 Check restraining devices on all pressure hoses

1.7 Fit and replace restraining devices on pressure hoses as required

1.8 Raise alarm and report as required

2. Install storage reel

2.1 Position the crane hook to the centre of the storage reel

2.2 Hoist the storage reel over the centre of the carrier and lower into saddles

2.3 Lock down the storage reel with retainer brackets and set tension screws

2.4 Install circulating equipment

3. Remove storage reel

3.1 Remove mud tank side hoses, swivel and cross over

3.2 Line up saddles and cut excess coil tubing on rig floor with casing cutter

3.3 Align saddles to remove storage reel

3.4 Install dog nut and chain coil

3.5 Cut coil tubing according to manufacturer and work requirements

3.6 Open level wind box, shut off the motor and lockout rig and open storage reel saddles

3.7 Remove the lockout and prepare to pick up the coil

3.8 Measure amount of coil cut and record remaining length

4. Install tubing snake connector

4.1 Prepare coil tubing ends

4.2 Conduct NDT crack test on the tubing stake connector

4.3 Check the o-rings for die retention are not stretched out

4.4 Separate the two-piece tubing snake connector in the middle at the threads

4.5 Size, install and tighten threaded half of tubing snake connector into the tail end of the coil tubing on the storage reel

4.6 Size, install and tighten threaded half of tubing snake connector into tail end of coil tubing on the injector side

4.7 Align tubing connector up and screw two tubing stake connector pieces together at centre treads

4.8 Perform and pull test on the tubing snake and confirm that the connector is locked in prior to removing chains

5. Handle tubing snake connector

5.1 Inspect derrick and rig floor for equipment

5.2 Raise derrick until injector coil tubing end and storage reel coil tubing line up

5.3 Check the integrity of the tubing stake connection by performing a pull test

5.4 Lock out floor motor according to manufacturer requirements

5.5 Remove storage reel retention chain and dog nut

5.6 Remove lock from the floor motor

5.7 Engage storage reel while maintaining the correct pressure

5.8 Run coil with tubing stake connector through injector making cuts until the tubing snake connector is completely through the injector

6. Install set screw tubing dimple

6.1 Prepare coil tubing ends with a grinder

6.2 Install the dimple template

6.3 Tighten all set screws on the dimple template

6.4 Loosen screws and remove template

6.5 Deepen the template indents with a drill to dimple screw depth

6.6 Install the tubing dimple and dimple set screws according to manufacturer requirements

7. Conduct bottom hole assembly operations

7.1 Prepare subs for use

7.2 Place float on bit and install bit sub onto bit

7.3 Run drill collar up v-door and pick up with top drive and elevators

7.4 Stab drill collar in bit sub and make up drill collar into bit sub

7.5 Pick up sub and position where needed for stabbing into stump

7.6 Stab the tubing dimple into the bottom hole assembly on the stump

7.7 Apply make up tong to dimple while rotating table to make up BHA

7.8 Apply breakout tong to dimple and make up to BHA while torqueing up BHA

8. Tripping in with coil tubing

8.1 Set bottom hole assembly depths at rotary Kelly bushing before lowering the lube tube

8.2 Confirm lube tube is down and air bag inflated on flow T

8.3 Confirm stripping head is deflated

8.4 Confirm the reel drag is set to no higher than 1000 psi

8.5 Set the traction pressure on the injector as low as possible without coil tubing slippage

8.6 Verify the trip speed with the Rig Manager

8.7 Verify level wind is continuously in line with coil tubing, depths are tracking correctly and conduct flow checks at the shaker box

9. Tripping out with coil tubing

9.1 Grease and inspect injector as per industry standards

9.2 Check the air bag on flow T is still inflated

9.3 Verify stripper rubber on the injector is inflated to the correct pressure, level wind is continuously in line with coil tubing and all depths are tracking at all times

9.4 Verify the trip speed with the Rig Manger

9.5 Lift the lube tube when bottom hole assembly reaches 75 metres prior to pulling out of hole

9.6 Conduct flow checks at specified intervals

10. Slip and cut coil tubing-grinder/rod cutter

10.1 Place tubing dimple at the desired working height

10.2 Place the hole cover in position

10.3 Remove tubing dimple

10.4 Run coil tubing through table to correct working height in cellar

10.5 Cut coil tubing with grinder/rod cutter

10.6 Remove with double wrapping sling and wire line

10.7 Lay down through v door