Construct artesian (flowing) aquifer bores

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver RIINHB411E, 'Construct artesian (flowing) aquifer bores'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Construct artesian (flowing) aquifer bores' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and prepare for the construction of artesian (flowing) aquifer bores

1.1 Obtain, interpret and confirm work requirements

1.2 Access, interpret and apply artesian (flowing) aquifer bores construction documentation and confirm work activity is compliant

1.3 Identify hazards and environmental issues, assess the risks and implement control measures in line with workplace procedures

1.4 Select and wear personal protective equipment required for work activities

1.5 Communicate with other personnel at site according to work requirements and confirm briefings and handover details are communicated and received

1.6 Discuss scope of work with client and give technical advice, cost structure, workmanship warranty, quantity and quality of materials, construction standards and methods to be used and gain general agreement on drilling plan

1.7 Complete required reports and provide reports, samples and strata logs, pump and development test results to relevant authorities as required

2. Design bores for artesian aquifer systems

2.1 Determine required construction methods and drilling fluid program according to down-hole conditions and anticipated pressures

2.2 Design bore according to environmental and work requirements

2.3 Select a bore site that will prevent contamination and minimise interference with other bores

2.4 Select likely water entry mechanism from the formation to the bore including open hole, slotted casing screens, gravel packs

2.6 Calculate required artificial pack design parameters, and recommended annular thicknesses required

2.7 Undertake calculations to determine appropriate screen/slot design parameters, including for diameter, length, aperture size

2.8 Select required bore/surface casing types, size, strength and wall thicknesses for the anticipated ground/water quality and pressure conditions and any construction requirements

2.9 Confirm all necessary materials anticipated for the job are available and on site prior to commencement of construction phase

3. Construct bores in artesian aquifer system

3.1 Carry out any pre-start and start up procedures according to manufacturer specifications and workplace procedures

3.2 Select, slot, assemble and insert casing and screens suitable for the formations in which they are deployed

3.3 Select, mix and place grout or seal surface according to legislative and company requirements and manufacturer specifications

3.4 Construct bore according to legislative requirements and workplace procedures

3.5 Use, maintain, test and record nontoxic, removable drilling fluids and additives according to manufacturer specifications and environmental requirements

3.6 Maintain plumbness and alignment of the hole within the required limitations and carry out a plumbness test where required

3.7 Prepare for and recognise any symptoms of a formation kick and take action to control the bore

3.8 Collect, store, record, label and transport formation and water samples according to licensing requirements

3.9 Arrange for geophysical logging tools to be run in bore if required

3.10 Determine aquifer formation grain size distribution from sieve analysis and interpret appropriate gravel pack and screen slot aperture dimensions for gravel packed wells

3.11 Select and place artificial pack materials

3.12 Remove drilling fluids from the bore to allow subsequent development

3.13 Maintain tool string inventories according to workplace procedures

4. Construct bore headworks

4.1 Construct headworks for bore including isolation valves to retain/control artesian flow and to permit independent testing of both pressure and flow without interference to reticulation system

4.2 Identify and protect headworks of the bore

4.3 Construct headworks to seal and cap the bore from surface water pollutants, environmental concerns and damage

4.4 Dispose of and neutralise wastewater or hazardous materials from site as required and complete restoration of the bore site camp facilities

5. Develop bore

4.1 Use development techniques with care to prevent collapsing of casing or screens

4.2 Undertake development until a continuous, clean supply if water is obtained according to site, contractual and regulatory requirements

4.3 Measure/calculate and record standing and drawdown water levels

4.4 Perform pump and/or development tests to estimate the sand content and sustainable yield of the bore

6. Disinfect/decontaminate bore and drilling equipment

6.1 Determine and monitor potential contaminants of drilling equipment

6.2 Disinfect and decontaminate bores and installed equipment constructed for potable supplies as required

7. Carry out bore maintenance and rehabilitation

7.1 Carry out and shutdown procedures and secure according to manufacturer specifications and workplace procedures

7.2 Undertake a process of diagnosis to determine likely cause of bore deterioration

7.3 Devise a rehabilitation program according to environmental requirements

8. Decommission artesian wells with flowing and/or non-flowing elements

8.1 Determine suitable decommissioning procedures and select required materials

8.2 Carry out the decommissioning (abandonment) of artesian aquifer bores

8.3 Place cement bridges at the top of the surface casing and at the surface casing shoe

8.4 Verify position/location of hole for future reference

8.5 Dispose of drill and other fluids safely according to environmental requirements and workplace procedures

8.6 Record entire decommissioning procedure and details of bore cementing according to workplace procedures

8.7 Complete bore completion report and submit to State/Territory Water Authority

8.8 Carry out housekeeping requirements according to workplace procedures