Licence to operate a vehicle loading crane (capacity 10 metre tonnes and above)

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver TLILIC0002, 'Licence to operate a vehicle loading crane (capacity 10 metre tonnes and above)'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Licence to operate a vehicle loading crane (capacity 10 metre tonnes and above)' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan work/task

1.1

Task requirements are identified from work orders or equivalent and a lift plan is confirmed with associated personnel and a site inspection is conducted in accordance with workplace procedures

1.2

Work area operating surface is confirmed to determine the quality of ground suitability for operational use of vehicle loading crane in accordance with workplace procedures

1.3

Vehicle loading crane rated capacity (RC) and the lifting gear Working Load Limit (WLL)are established for the load/s and work/task requirements in accordance with manufacturer requirements and workplace procedures

1.4

Appropriate paths for operating the vehicle loading crane and moving and placing load/s in work area are assessed and determined in accordance with workplace procedures

1.5

Relevant hazard identification and risk elimination/control measures are applied and advised to associated personnel in accordance with workplace procedures

1.6

Traffic management plan implementation is confirmed and followed in accordance with workplace procedures

1.7

Appropriate communication procedures are identified and tested with associated personnel in accordance with workplace procedures

1.8

All tasks are confirmed to ensure requirements for the relevant work area in accordance with workplace procedures

2

Prepare for work/task

2.1

Consultation with workplace personnel is established and maintained to ensure all crane and lifting operations are clear and consistent with site requirements in accordance with a lift plan and workplace procedures

2.2

Risk control measures for hazards identified are checked for implementation in accordance with the lift plan and safe work procedures

2.3

Vehicle loading crane controls are accessed safely in accordance with manufacturer requirements and safe work procedures

2.4

Pre-start vehicle loading crane checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with safe work procedures and manufacturer requirements

2.5

Vehicle loading crane is set up correctly with any lifting gear as per the lift plan in accordance with relevant manufacturer requirements including load chart/s and safe work procedures

2.6

Boom/jib and lifting gear are set up as required in accordance with specific manufacturer requirements and safe work procedures

2.7

Vehicle loading crane is stabilised appropriately in accordance with the lift plan, relevant manufacturer requirements and safe work procedures

2.8

Operational checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer requirements and safe work procedures

2.9

Vehicle loading crane logbook is inspected and is correct for the crane type, is completed and signed and required rectifications have been signed off in accordance with manufacturer requirements and safe work procedures

2.10

Weather and work environment conditions are assessed to determine any impact on vehicle loading crane operations in accordance with manufacturer requirements and safe work procedures

3

Perform work/task

3.1

Lifts are determined within the RC of the vehicle loading crane in accordance with the load chart/s and lift plan

3.2

Boom/jib and hook block are safely positioned over the load following directions from associated personnel in accordance with the lift plan and safe work procedures

3.3

Lifting gear is connected to the load and used safely in accordance with the lift plan, safe work procedures and manufacturer requirements

3.4

Test lift is carried out in accordance with dogging and safe work procedures

3.5

Loads are transferred using relevant crane movements and tag lines as required, in accordance with lift plan and safe work procedures

3.6

Load and crane movement is monitored constantly and crane is operated safely in accordance with lift plan and safe work procedures

3.7

All required communication signals are correctly interpreted and followed whilst crane is operated in accordance with the lift plan and safe work procedures

3.8

Load is lowered and landed safely in accordance with lift plan and safe work procedures

3.9

Lifting gear is disconnected from load and crane is positioned safely and efficiently for next task in accordance with lift plan and safe work procedures

4

Pack up

4.1

Crane boom/jib, lifting gear and associated equipment is stowed and secured as required in accordance with manufacturer requirements and safe work procedures

4.2

Relevant motion locks and brakes are applied as required in accordance with manufacturer requirements and safe work procedures

4.3

Stabilisers are stowed and secured in accordance with manufacturer requirements and safe work procedures

4.4

Crane is shut down and secured to prevent unauthorised access/use in accordance with safe work procedures

4.5

Plates or packing are stowed and secured in accordance with safe work procedures

4.6

Shut down crane checks are carried out in accordance with safe work procedures and manufacturer requirements