Licence to operate a boom-type elevating work platform (boom length 11 metres or more)

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver TLILIC0005, 'Licence to operate a boom-type elevating work platform (boom length 11 metres or more)'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Licence to operate a boom-type elevating work platform (boom length 11 metres or more)' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan work/task

1.1

Task requirements are identified from work orders or equivalent and confirmed with relevant people and a site inspection is completed in accordance with workplace procedures

1.2

Work area ground/operating surface is assessed to determine suitability for operational use of EWP in accordance with manufacturer requirements and workplace procedures

1.3

EWP capabilities are established for the load/s and work/task requirements in accordance with manufacturer requirements and workplace procedures

1.4

Appropriate paths for operating the EWP and moving in work area are assessed and determined in accordance with workplace procedures

1.5

Relevant hazard and risk control measures are applied and advised to relevant person/s in accordance with workplace procedures

1.6

Traffic management plan implementation is confirmed in accordance with workplace procedures

1.7

Appropriate communication procedures are identified, with relevant people in accordance with workplace procedures

1.8

All work is confirmed to ensure coverage of work/task requirements for the relevant work area in accordance with workplace procedures

2

Prepare for work/task

2.1

Consultation with workplace person/s is maintained to ensure workplan is clear and consistent with site requirements in accordance with workplace procedures

2.2

Risk control measures for hazards identified are checked for implementation in accordance with workplace procedures

2.3

Safety equipment including Personal Protective Equipment (PPE) are inspected, fitted correctly and used in accordance with manufacturer requirements and safe work procedures

2.4

EWP is accessed in a safe manner in accordance with manufacturer requirements and safe work procedures

2.5

Pre-start EWP checks are carried out in accordance with manufacturers requirements and safe work procedures

2.6

EWP is started and is checked for any abnormal noises in accordance safe work procedures

2.7

EWP is positioned correctly as per work plan in work area in accordance with relevant manufacturer requirements and safe work procedures

2.8

EWP is stabilised appropriately in accordance with the workplan, relevant manufacturer requirements and safe work procedures

2.9

Operational checks from base controls are carried out in accordance with relevant manufacturer requirements and safe work procedures

2.10

All platform controls are located, identified and tested in accordance with manufacturer requirements and safe work procedures

2.11

All damage and defects are reported and appropriate action is taken to rectify in accordance with manufacturer requirements and safe work procedures

2.12

EWP logbook is inspected and is correct for the EWP, is completed and signed in accordance with manufacturer requirements and safe work procedures

2.13

Weather and work environmental conditions are assessed to determine any impact on EWP operation and positioning as per workplan in accordance with manufacturer requirements and safe work procedures

3

Perform work/task

3.1

Relevant hazard prevention/control measures identified are checked for implementation in accordance with safe work procedures

3.2

EWP is safely located at point of work in work area in accordance with safe work procedures

3.3

EWP platform is positioned for work tasks and stability and all operations are monitored constantly in accordance with safe work procedures

3.4

Work gear and tools are stowed and secured in accordance with safe work procedures

3.5

EWP is operated using all movements in accordance with safe work procedures and manufacturer requirements

3.6

Unplanned and unsafe situations are responded to in accordance with safe work procedures

3.7

All communication signals are correctly interpreted and followed whilst EWP is operated in accordance with safe work procedures

3.8

EWP platform is accessed and egressed in accordance with safe work procedures and manufacturer requirements

3.9

EWP is parked, switched off and isolated appropriately in accordance with manufacturer requirements and safe work procedures

4

Pack up

4.1

Post-operational EWP checks are carried out in accordance with manufacturer requirements and safe work procedures

4.2

EWP boom is retracted, lowered, stowed and secured in accordance with manufacturer requirements and safe work procedures

4.3

Safety equipment and PPE is disconnected from platform in accordance with safe work procedures

4.4

Relevant motion locks and brakes are applied as required in accordance with manufacturer requirements and safe work procedures

4.5

Outriggers and/or stabilisers, plates or packing if fitted are stowed and secured in accordance and with manufacturer requirements and safe work procedures

4.6

EWP is shut down in accordance with manufacturer requirements and safe work procedures