Carry out preparatory energy sector work activities

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEECD0008, 'Carry out preparatory energy sector work activities'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Carry out preparatory energy sector work activities' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan energy sector support activity

1.1

Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are obtained and applied

1.2

WHS/OHS hazards are identified, risks assessed and control measures implemented for energy sector work preparation

1.3

WHS/OHS hazards not previously identified are noted on job safety assessments and advice is sought from work supervisor

1.4

Work instructions are obtained and the nature, scope and location of work is determined from the supervisor or appropriate person/s

1.5

Advice is sought from supervisor or appropriate person/s to ensure work is coordinated effectively with others

1.6

Materials required for work are determined in accordance with workplace procedures

1.7

Tools, equipment and testing devices needed to carry out work are obtained and checked for correct operation and safety

2

Undertake energy sector support activity

2.1

WHS/OHS risk control measures and workplace procedures for carrying out work are followed

2.2

Plant and equipment are checked in accordance with manufacturer guidelines/instructions, WHS/OHS requirements and workplace procedures

2.3

Mechanical equipment is installed straight and square in the required locations and within acceptable tolerances in accordance with relevant industry standards

2.4

Hand and power tools are used in accordance with safe working practices and WHS/OHS requirements and workplace procedures

2.5

Work instructions are carried out under supervision

2.6

Unplanned events are referred to relevant supervisor and directions are followed in accordance with workplace procedures

3

Complete energy sector work activity

3.1

WHS/OHS work completion risk control measures and workplace procedures are followed

3.2

Work site is cleaned and made safe in accordance with workplace procedures

3.3

Supervisor is notified of work completion in accordance with workplace procedures