Maintain conveyors and associated equipment

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEPMNT308, 'Maintain conveyors and associated equipment'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Maintain conveyors and associated equipment' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan and prepare for work

1.1

Requirements including scope of work and assigned roles are identified and confirmed with appropriate personnel or by site inspection, in accordance with workplace procedures

1.2

Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers' specifications, environmental obligations and workplace procedures are reviewed in preparation for work

1.3

Resources for work activities are obtained and inspected for compliance with job specification

1.4

Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures

1.5

Correct materials and components for work are obtained and inspected, in accordance with workplace procedures, for compliance with job specification

1.6

Work is planned, sequenced and prioritised, in accordance with workplace procedures

1.7

Potential hazards are identified, and risk control measures are selected and implemented, in accordance with workplace procedures

1.8

Work area is prepared, in accordance with workplace procedures

2

Remove associatedequipment to facilitate maintenance

2.1

Faulty components and parts of conveyor system are identified and isolations are confirmed, where appropriate, in accordance with workplace procedures

2.2

Associated equipment of conveyor system is disconnected, in accordance with the workplace procedures

2.3

Associated equipment of conveyor system is removed, in a manner which will assist in replacement, in accordance with the workplace procedures

2.4

Conveyors and associated equipment are inspected for abnormalities, in accordance with workplace procedures

3

Maintain conveyors or associated equipment

3.1

Belt tensioning equipment is released and secured, to facilitate maintenance, in accordance with workplace procedures

3.2

Sketches are made, data is noted and components are marked for identification or reassembly, in accordance with manufacturers' specification and workplace procedures

3.3

Modifications or alterations outside of manufacturers' specification are approved, in accordance with workplace procedures

3.4

New components are installed, and inspected for compliance with job specification, and are prepared for reassembly, in accordance with workplace procedures

3.5

Dimensional inspection is performed, in accordance with workplace procedures, using precision measuring devices to determine compliance

3.6

Conveyors are levelled, aligned and tensioned, in accordance with workplace procedures and site requirements

4

Replaceorinstall conveyors or associated equipment

4.1

Faulty components and parts are identified, and site is prepared for conveyors and associated equipment to be replaced, in accordance with workplace procedures

4.2

Conveyors and associated equipment are replaced, in accordance with workplace procedures and manufacturers' specification

4.3

Conveyors and associated equipment are levelled, aligned and coupled, in accordance with workplace procedures

4.4

All fastenings are torqued, in accordance with workplace procedures and manufacturers' specifications

4.5

Conveyors and associated equipment are given a test run, monitored and adjusted, as required, in accordance with workplace procedures and manufacturers' specifications

5

Complete work

5.1

Work is completed and appropriate personnel are notified, in accordance with workplace procedures

5.2

Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures

5.3

Tools and equipment are cleaned, maintained and stored, in accordance with workplace procedures

5.4

Work completion details are finalised, in accordance with workplace procedures


Qualifications and Skillsets

UEPMNT308 appears in the following qualifications:

  • UEP40312 - Certificate IV in ESI Generation Maintenance (Mechanical)
  • UEP50312 - Diploma of ESI Generation (Maintenance)