Test and commission electronic instrumentation equipment

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEPMNT431, 'Test and commission electronic instrumentation equipment'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Test and commission electronic instrumentation equipment' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan and prepare for work

1.1

Requirements including scope of work and assigned roles are identified and confirmed with appropriate personnel or by site inspection, in accordance with workplace procedures

1.2

Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work

1.3

Resources are obtained and inspected for compliance with job specification

1.4

Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures

1.5

Correct materials and components for work are obtained and inspected, in accordance with workplace procedures, for compliance with job specification

1.6

Work is planned, sequenced and prioritised, in accordance with workplace procedures

1.7

Potential hazards are identified, and risk control measures are selected and implemented, in accordance with the workplace procedures

1.8

Work area is prepared, in accordance with workplace procedures

2

Test wiring systems

2.1

Isolations for work are confirmed, where appropriate, in accordance with workplace procedures and site requirements

2.2

Wiring systems are tested, in accordance with workplace procedures, plans, drawings and manuals

2.3

Wiring systems, including enclosures and supports, are inspected, in accordance with workplace procedures, prior to testing to ensure absence of damage, defect or deterioration

2.4

Fixed wiring is tested, in accordance with workplace procedures, and results are documented to confirm compliance with job specification

3

Test piping and tubing systems

3.1

Isolations are confirmed, where appropriate, in accordance with workplace procedures

3.2

Piping and tubing systems are tested, in accordance with workplace procedures, plans, drawings and manuals

3.3

Piping and tubing systems, including enclosures and supports, are inspected, in accordance with workplace procedures, prior to testing to ensure absence of damage, defects or deterioration

3.4

Fixed piping and tubing is tested, in accordance with workplace procedures and results are documented to confirm compliance with job specification

4

Test electronic instrumentationequipment

4.1

Isolations are confirmed, where appropriate, in accordance with workplace procedures

4.2

Electronic instrumentation equipment is tested, in accordance with workplace procedures, plans, drawings and manuals

4.3

Test conditions are confirmed and equipment is inspected, in accordance with workplace procedures, to ensure absence of damage, defect or deterioration

4.4

Electronic instrumentation equipment test results are documented to confirm compliance with job specification

5

Commission electronic instrumentationequipment

5.1

Isolations are confirmed, where appropriate, in accordance with workplace procedures

5.2

Electronic instrumentation equipment is commissioned, in accordance with workplace procedures, using appropriate plans, drawings and manuals

5.3

Electronic instrumentation equipment is set up, in accordance with workplace procedures, operational requirements and manufacturers' specifications

5.4

Testing and monitoring results are monitored and documented, in accordance with workplace procedures, to ensure equipment functions within manufactures' specifications

5.5

Electronic instrumentation equipment is commissioned, in accordance with workplace procedures

5.6

Final inspection is carried out, in accordance with workplace procedures

6

Complete work

6.1

Work is completed and appropriate personnel are notified, in accordance with workplace procedures

6.2

Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures


Qualifications and Skillsets

UEPMNT431 appears in the following qualifications:

  • UEP40512 - Certificate IV in ESI Generation Maintenance - Electrical Electronics
  • UEP40506 - Certificate IV in ESI Generation Maintenance (Electrical/Electronic)
  • UEP50412 - Diploma of ESI Generation Maintenance - Electrical Electronic