Operate and monitor auxiliary steam systems

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UEPOPS329, 'Operate and monitor auxiliary steam systems'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Operate and monitor auxiliary steam systems' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan and preparefor auxiliary steam system plant operation

1.1

Safety issues related to operating and monitoring auxiliary steam system plant are identified, in accordance with workplace procedures and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and legislative requirements

1.2

Work requirements including permits to work are identified, in accordance with workplace procedures, and from relevant personnel and documentation

1.3

Documentation to determine auxiliary steam system plant status is assessed and evaluated, in accordance with workplace procedures

1.4

Inspection, preoperational checks and field preparation for auxiliary steam system plant service are carried out, in accordance with workplace procedures and manufacturers' recommendations

1.5

Auxiliary steam system plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations

1.6

Sequence for recommissioning of auxiliary steam system plant is determined, in accordance with workplace procedures and site requirements

2

Operate auxiliary steam systemplant

2.1

Auxiliary steam system plant is operated, in accordance with workplace procedures and manufacturers' operating recommendations

2.2

Auxiliary steam system plant is monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions

2.3

Corrective actions are taken to rectify auxiliary steam system plant abnormalities, in accordance with workplace procedures, industry standards and site requirements

3

Test auxiliary steam systemplant operation

3.1

Operational tests are performed, in accordance with workplace procedures

3.2

Auxiliary steam system plant is observed for correct operational response, in accordance with workplace procedures

3.3

Corrective action is taken when response does not meet with documentation, auxiliary steam system plant integrity or personnel safety requirements

3.4

Auxiliary steam system plant is returned to required operational status upon completion of testing, in accordance with workplace procedures

4

Analyse auxiliary steam systemplant faults

4.1

Causes of abnormal auxiliary steam system plant operating conditions are identified, in accordance with workplace procedures, and by analysing technical and operational information

4.2

Corrective action is taken, in accordance with workplace procedures

4.3

Auxiliary steam system plant integrity and personnel safety is maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation

5

Monitor and inspect auxiliary steam systemplant

5.1

Auxiliary steam system plant to be monitored and inspected is physically identified, in accordance with workplace procedures

5.2

Auxiliary steam system plant is monitored and inspected, in accordance with workplace procedures, to detect deviations from normal operating conditions of the plant

5.3

Corrective action is taken, in accordance with workplace procedures

5.4

Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected

6

Complete documentation

6.1

Auxiliary steam system plant problems, movements, and status are reported, in accordance with workplace procedures

6.2

Documentation is updated, in accordance with workplace procedures


Qualifications and Skillsets

UEPOPS329 appears in the following qualifications:

  • UEP30212 - Certificate III in ESI Generation - Operations
  • UEP40112 - Certificate IV in ESI Generation - Systems Operations
  • UEP30112 - Certificate III in ESI Generation - Systems Operations
  • UEP40212 - Certificate IV in ESI Generation - Operations
  • UEP50112 - Diploma of ESI Generation - Systems Operations
  • UEP50212 - Diploma of ESI Generation (Operations)