Maintain energised transmission lines using high voltage live work bare hand method

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver UETTDRTP32, 'Maintain energised transmission lines using high voltage live work bare hand method'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Maintain energised transmission lines using high voltage live work bare hand method' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to maintain energised transmission lines using HV live work bare hand method

1.1

Work schedules, construction plans, drawings, workplace procedures and material lists are obtained and analysed

1.2

Job requirements and workplace procedures are identified and communicated with relevant personnel

1.3

Hazards are identified, WHS/OHS risks assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures

1.4

Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures

1.5

Risk control measures are identified, prioritised and evaluated against the work schedule

1.6

Relevant work permits are obtained and signed in accordance with workplace procedures

1.7

Equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order

1.8

Relevant personnel at worksite are confirmed current in first aid, cardiopulmonary resuscitation (CPR) and other rescue procedures in accordance with job requirements and/or workplace procedures

1.9

Liaison and communication issues with authorised personnel, authorities, clients and land owners are resolved to perform work, as required

1.10

Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures

1.11

Personnel participating in work are fully briefed and responsibilities confirmed in accordance with workplace procedures

1.12

Traffic management is planned and implemented in accordance with workplace procedures

2

Perform maintenance of transmission lines using HV live work bare hand method

2.1

WHS/OHS, sustainable energy and environmental principles and practices are monitored and actioned to reduce incidents of accidents in accordance with workplace procedures

2.2

First aid, CPR and other rescue procedures are performed in accordance with job requirements and/or workplace procedures

2.3

Requirements for lifting, climbing, working at heights, confined spaces and use of power tools/equipment are followed in accordance with workplace procedures

2.4

Auto-reclose devices and associated circuits are rendered inoperative and necessary work documentation obtained in accordance with workplace procedures

2.5

Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are reported to immediate authorised personnel for directions in accordance with workplace procedures

2.6

Remedial actions are taken to overcome shortfalls encountered in the work schedule in accordance with job requirements and workplace procedures

2.7

Maintenance of energised HV overhead electrical transmission apparatus is performed in accordance with work schedules, job requirements and workplace procedures

2.8

Energised HV overhead electrical transmission apparatus is maintained to ensure completion in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures

2.9

Solutions to non-routine problems are identified and actioned using in accordance with workplace procedures

2.10

Quality checks of work are undertaken in accordance with industry standards and workplace procedures

3

Complete the maintenance of transmission lines using HV live work bare hand method

3.1

Completed work is checked against work schedule, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures

3.2

Accidents and/or injuries are reported and followed up in accordance with requirements/workplace procedures

3.3

Worksite is rehabilitated, cleaned up and confirmed safe in accordance with workplace procedures

3.4

Tools, equipment, surplus resources and materials are cleaned, checked and returned to storage in accordance with workplace procedures

3.5

Relevant work permits are signed off and client/customer advised in accordance with workplace procedures

3.6

Work records, reports and/or documentation are completed in accordance with workplace procedures