Elements and Performance Criteria
- Inspect and prepare the installation site
- Site is checked for location, dimension, levels, etc. using appropriate measuring equipment.
- Non-compliance with specification is reported to appropriate authority.
- Alteration and correction is undertaken with approval of appropriate authority.
- All surfaces, materials and components are prepared for use.
- Install machinery/plant and equipment
- Work is carried out safely and in accordance with site procedures, standard operating procedures and legislative requirements.
- Machine/equipment components are prepared for correct sequential installation.
- Machinery/plant or equipment is installed in accordance with manufacturer and site specifications.
- Routine modification/alterations are undertaken to operating procedures, where required.
- Machine/equipment is levelled, aligned, connected or coupled where required (excluding electrical connections).
- Site is cleaned and cleared of all debris and left in safe state.