Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for rail traction switching operations to a given schedule
  2. Job requirements and workplace procedures are identified and communicated with relevant personnel
  3. Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for rail traction switching operations to a given schedule are obtained and confirmed for the purposes of the work to be performed
  4. Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
  5. Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures
  6. Relevant work permits are obtained to access rail corridor and perform work in accordance with job requirements and/or workplace procedures
  7. Plant, equipment, tools and personal protective equipment (PPE) required for work is identified, obtained and confirmed in working order
  8. Liaison and communication issues with authorised personnel, authorities, clients and land owners are resolved to perform work, as required
  9. Modifications to the scheduled which may be required after assessing the worksite is communicated to appropriate personnel for formal approval
  10. Worksite is prepared to minimise risk, damage to property, assets and individuals in accordance with track protection officer and/or network control officer and workplace procedures
  11. Personnel participating in work are fully briefed and responsibilities confirmed in accordance with workplace procedures
  12. Traffic management plan is identified and implemented in accordance with workplace procedures
  13. Carry out rail traction switching operations to a given schedule
  14. Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
  15. Switching of rail traction operations are completed in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures
  16. Communications with switching control officer are established and maintained during isolation operation in accordance with workplace procedures
  17. Electrical equipment, associated circuits, line/network or worksite is isolated and proven de-energised using appropriate testing devices and earthed or rail connected, where required, in accordance with requirements and workplace procedures
  18. Solutions used to solve problems are applied in accordance with workplace procedures
  19. Quality checks of work are undertaken in accordance with workplace procedures
  20. Complete rail traction switching operations to a given schedule
  21. WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
  22. Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
  23. Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
  24. Relevant work permits are signed off, safety devices removed, and the system made ready to be re-energised and returned to service in accordance with workplace procedures
  25. Work completion records, reports, as installed modified drawings, documentation and information are finalised, processed and relevant personnel and authorities notified