Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UETTDRSB32 Mapping and Delivery Guide
Maintain power transformer on load tap changers (OLTC)
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UETTDRSB32 - Maintain power transformer on load tap changers (OLTC) |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to maintain power transformer on-load tap changers (OLTC) in the electricity supply industry (ESI).It includes maintaining, repairing and overhauling substation voltage regulating equipment restricted to resistor and reactor type high speed OLTC but does not include the main tank tap selector mechanism. It also includes inspecting, recording of information, testing and measuring of associated control circuits, range of acceptance tests required on installed complete units within the parent power transformer, diagnostic and pre-commissioning checks and tests involving tap changers and interpreting these results against agreed specifications.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Substation |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to maintain voltage regulating equipment (tap changers) |
| |||||||
Element: Job requirements and workplace procedures are identified and communicated with relevant personnel | ||||||||
Element: Hazards are identified, work health and safety (WHS)/occupational health and safety (OHS)risks assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures | ||||||||
Element: Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures | ||||||||
Element: Risk control measures are identified, prioritised, implemented and evaluated against the work schedule | ||||||||
Element: Equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order | ||||||||
Element: Liaison and communication issues with authorised personnel, authorities, clients and land owners are resolved to facilitate work, as required | ||||||||
Element: Personnel participating in work are fully briefed and responsibilities confirmed in accordance with workplace procedures | ||||||||
Element: Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures | ||||||||
Element: Carry out the maintenance of voltage regulating equipment (tapchangers) |
| |||||||
Element: Cardiopulmonary resuscitation (CPR), rescue from live electrical apparatus and other related safety procedures are in place in accordance with job requirements and/or workplace procedures | ||||||||
Element: Safe working documentation is acquired and requirements completed in accordance with workplace procedures | ||||||||
Element: Requirements for lifting, climbing, working at heights, confined spaces and use of power tools/equipment are followed in accordance with workplace procedures | ||||||||
Element: Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are reported to immediate authorised personnel for directions in accordance with workplace procedures | ||||||||
Element: Oil circuits are isolated and tap changer vessels drained in accordance with workplace and environmental protection procedures | ||||||||
Element: Tap changer is withdrawn and maintained in accordance with manufacturer instructions and workplace procedures | ||||||||
Element: Pre-service tests and measurements are conducted in accordance with workplace procedures | ||||||||
Element: Voltage regulating equipment (tap changers) are safely maintained to ensure completion in agreed timeframes, to quality standards and with minimum waste | ||||||||
Element: Unplanned events or conditions are responded to in accordance with workplace procedures | ||||||||
Element: Complete the maintenance of voltage regulating equipment (tapchangers) |
| |||||||
Element: Safe working documentation is surrendered and transformer made ready for service | ||||||||
Element: Worksite is rehabilitated, cleaned up and confirmed safe in accordance with workplace procedures | ||||||||
Element: Tools, equipment, surplus resources and materials are cleaned, checked and returned to storage in accordance with workplace procedures | ||||||||
Element: Work records, reports and/or documentation are completed in accordance with workplace procedures and relevant personnel notified |