Install underground telecommunications infrastructure

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver ICTTEN210, 'Install underground telecommunications infrastructure'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Install underground telecommunications infrastructure' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and prepare to install underground infrastructure

1.1 Access, read, interpret and confirm work plans/specifications

1.2 Identify and confirm as required, relevant legislation, regulations, industry standards and enterprise requirements

1.3 Verify scope of work can be carried out without damaging any existing infrastructure such as underground services

1.4 Set-up worksite to ensure public and worker safety according to enterprise requirements

1.5 Select equipment/tools for work activities and ensure their operational status

1.6 Identify, confirm and apply enterprise environmental protection requirements

1.7 Select and wear correct personal protective equipment (PPE) appropriate for work activities

1.8 Identify potential hazards, assess risks, implement risk control measures

1.9 Obtain and follow emergency procedures

2. Set out and excavate

2.1 Prepare work area and materials

2.2 Determine and apply dewatering requirements

2.3 Determine location, alignment direction, level and grade of incoming infrastructure

2.4 Set out works according to specifications

2.5 Advise plant operator of excavation requirements and monitor levels

2.5 Install trench support or batters as required

2.6 Install bedding for underground structures

3. Install underground infrastructure

3.1 Lower materials and place in position

3.2 Join conduits, manhole and ducts

3.3 Continually check alignment level and grade

3.4 Position side support and/or overlay beside pipes

3.5 Check pipeline system support structure

3.6 Monitor backfill procedure and ensure work is completed according to enterprise requirements

3.7 Construct underground infrastructure and follow test procedures to establish functionality and serviceability

4. Clean up

4.1 Clear work area and dispose of or recycle materials according to enterprise requirements

4.2 Clean, check, maintain and store plant, tools and equipment

4.3 Record and report test results on plans as-built

4.4 Update Dial Before You Dig database as required


Qualifications and Skillsets

ICTTEN210 appears in the following qualifications:

  • ICT20310 - Certificate II in Telecommunications Cabling
  • ICT20510 - Certificate II in Telecommunications Rigging Installation
  • ICT20110 - Certificate II in Telecommunications Technology
  • ICT20210 - Certificate II in Telecommunications
  • ICT30310 - Certificate III in Telecommunications Cabling
  • ICT30210 - Certificate III in Telecommunications
  • ICT30610 - Certificate III in Broadband and Wireless Networks
  • ICT20410 - Certificate II in Telecommunications Digital Reception Technology
  • ICT40610 - Certificate IV in Telecommunications Networks Technology

And the skillsets: