Set up and shut down on-train remote control system

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver TLIB3027A, 'Set up and shut down on-train remote control system'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Set up and shut down on-train remote control system' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1Set up remote control system

1.1 Remote control system components are set up in accordance with operational plans and manufacturers instructions

1.2 Remote motive power units are placed in required operating mode

1.3 Communication code is entered and air and electrical systems are activated

1.4 Brake and traction systems are tested using approved personnel to ensure correct operation

2Set up lead control system

2.1 Cab console is checked, electrical systems are activated and the system self-test is confirmed

2.2 Communication code is entered and confirmation obtained that system has entered link mode

2.3 Full control is obtained and brake tests are conducted, using lead control equipment, to ensure correct braking is operational

2.4 Procedures to establish total control are repeated where necessary

2.5 Train is moved using the full range of tests to ensure operational safety and control

3Shut down remote control equipment

3.1 Shut-down procedures of lead and remote control equipment are followed to ensure train security and de-activation of the system

3.2 Equipment indicators or functions are operated to ensure the shut-down process is correct and complete


Qualifications and Skillsets

TLIB3027A appears in the following qualifications:

  • TLI30410 - Certificate III in Transport and Logistics (Rail Operations)
  • TLI30410 - Certificate III in Transport and Logistics (Rail Operations)
  • TLI42613 - Certificate IV in Train Driving